Laserfiche WebLink
INSPECTION REPORT <br /> . s/-771-1._ Date 3/Vi" Permit:g(44/70// DZ '6/��� <br /> Contractor: ��/ <br /> Owner: it lS5i1p 4/VW,11 <br /> Site Address: 2-5 14, S <br /> “ Eili- <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ['Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION:II / If ` <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS P RMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED .. <br /> [j] OK FOR C.O. El VIOLATIONAim <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> Li CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> I 1...--- g... p A de.. <br /> ________________F ,` Z--. .63 ..,,... ....._,_ <br /> Inspector: T-,-) / Date: 3 ---7 _'(e <br /> EIR(10/06) DATABAR,INC. <br />