Laserfiche WebLink
FOR OFFICE USE ONLY PERMIT# b. <br /> BUILDING PLANNING <br /> Bldg/TI/Addn/Rem Size Zoning Classification \- <br /> Garage Size Overlay/Agreement <br /> VALUATION Nonresidential Use <br /> Number of Stories Residential Use <br /> Occupancy Group Proposed No. of Dwelling Units: <br /> Occupant Load Total No. of Dwelling Units: <br /> Basement No_ Yes_ Fin / Unfin Landscape or Planning Inspection <br /> Type of Construction needed before final? Yes_ No <br /> Existing Sprinkler System? Yes_ No_Unk Planning Inspector: <br /> Fire Sprinkler Required Yes_ No_ Phone#: <br /> Reason Approved by: c Date: .,(4)/ 1.- <br /> Existing Fire Alarm Yes_ No_Unk_ Historic Approved by: Date: <br /> Fire Alarm Required Yes_ No_ School Mitigation Reqd? Yes_ No Ni <br /> Reason Everett School Dist Mukilteo School Dist <br /> RCW 64.55 MF worksheet req'd for permit? Yes_ No_ #of Net New Units: <br /> Add'I RCW 64.55 docs required prior to final?Yes_ No_ Calculated School Impact Fee: <br /> Architectural Approved By/Date: ,J 1 1 �g School Impact Fee Credit: <br /> Structural Approved By/Date: ` Total School Impact Fee Owed: <br /> Comments: C.s. ''p cru< Comments: <br /> tya c+aikAkriAa lb -scvdoc.zvsat.: a. Tc tat-A-A C1,00 -CCi <br /> L.4 TICRI <br /> Intake OK by: Intake OK by: Ok to route _ Hold _ <br /> Make this a"W"Permit? Yes No <br /> PUBLIC WORKS <br /> FEES INTAKE: Checked By: Date: <br /> Plan Check Fee Comments: <br /> Building Permit <br /> Surcharge High Hazard Sites(Dental/Medical,Animals,Mortuary,etc-Review for RPBA) <br /> Additional Plan Check 0 Public Works/Sys Dev/Traffic Mit./RPBA-NOT REQUIRED <br /> Plumbing Fee 0 Route for Public Works Review(bldg folder, PW Worksheet) <br /> Mechanical Fee 0 Public Works Permit-Concurrent Review(separate green folder) <br /> Ping Bldg Review Fee PW REVIEW: PW Reviewer: Date: <br /> Water Fee ❑ PW Permit Approved-PW <br /> Sewer Fee 0 See PW Review Worksheet <br /> Systems Dev. Fee 0 PW Permit Not Required <br /> Traffic Mitigation Fee <br /> Public Works Fee FIRE DEPARTMENT <br /> School Mitigation Fee Update/New Sprinklers Yes_ No Existing Bldg._ <br /> Update/New Detection Yes_ No_ Existing Bldg._ <br /> Update/New Chemical Yes No_ Existing Bldg._ <br /> Update/New Fire Service Yes_ No_ Existing Bldg. <br /> Approved by: Date: - -� <br /> Comments: <br /> j <br />