My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2502 WALNUT ST 2018-04-18
>
Address Records
>
WALNUT ST
>
2502
>
2502 WALNUT ST 2018-04-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/18/2018 2:14:29 PM
Creation date
4/16/2018 7:28:24 AM
Metadata
Fields
Template:
Address Document
Street Name
WALNUT ST
Street Number
2502
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIVIIIORKS PERMIT Date Applied: 1/29/2018 <br /> City of Everett Public Works Department Puorks Permit#: PW1801 051 <br /> 3200 Cedar Street Parent Permit#: <br /> Everett,WA 98201 Planning Reference#: <br /> (425)257-8810 Public Works Fee: $65 <br /> OWNER NAME AND ADDRESS: APP !CANT NAME AND ADDRESS: <br /> TERESA A. McNEIL/ANDREW G HIGHFILL ANDREW G. HIGHFILL <br /> 2505 MAPLE ST 2505 MAPLE ST <br /> EVERETT, WA, 98201 EVERETT,WA, 98201 <br /> PHONE: 2069621296 PHONE: 2069621296 <br /> TAX PARCEL ID#: SITE ADDRESS: 2502 WALNUT AVE <br /> DESCRIPTION: FENCE IN THE RIGHT OF WAY <br /> (1/29/2018 2:29 PM BES) <br /> REDO THE EXISTING FENCE IN THE RIGHT OF WAY <br /> • <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards <br /> and Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig. The day you call does not count. TOLL FREE NUMBER 811. <br /> 4. The fence shall be no greater than 6 feet in height on the rear and side yards. <br /> 5. The fence shall be no greater than 42 inches in height in the front yard (shortest property frontage, unless ot,tRrwis ;; <br /> noted or previously determined). The fence has to have 50% transparency per planning requirement-1— i 41'' <br /> 6. Fence shall be no greater than 36 inches in height within the 15ft sight triangles at the interspctiop,ott roadway and <br /> the alley/intersecting roadway. _H„1 1 :1;; :==.r <br /> 7. Protect all existing underground utilities during construction. Fence posts shall be at least 2 awaC sf rr�"an . inderground <br /> utility. <br /> 8. Contact the Cityof Everett Public Works Inspector RandyAllen at 425-339-7403prior to startingconstruction an �,` ' all <br /> p d_.;W!� <br /> other inspection requests. See attached to request an inspection. r:? <br /> 10. This fence constructed within the public right-of-way must be removed or relocated at the owner's expense if the city <br /> ever requires use of the right-of-way for municipal purposes. <br /> i.�;= <br /> . r•."a r•.'r•.a <br /> Public Works Permit Fee Breakdown: a r' �_'� 'n <br /> Fence in R.O.W. $25.00 z:0 ~'`*' <br /> PW Plan Review(EST) $20.00 <br /> PW Site Inspection (EST) $20.00 <br /> City of EverettOfcial Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> / The undersigned owner/applicant hereby agrees to hold and save <br /> harmless the City of Everett from any and all claims for damages,costs, <br /> .fit/ <br /> / / 3l y expenses,or causes of action that may arise because of installation and <br /> / maintenance of the improvement or other right-of-way use here to applied <br /> .pr. -: for Construction'•lic Works) to for and further agrees to remove same upon notice from the City and to <br /> replace public property damaged thereby. <br /> a <br /> FINAL INSPECTION Date <br /> 1 .'5+./ <br /> Approved as Constructed (PW Inspector) Signature of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br /> COMPLETEION.THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90-DAY DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.