My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11225 19TH AVE SE ARTESIA APARTMENTS 2023-07-03
>
Address Records
>
19TH AVE SE
>
11225
>
ARTESIA APARTMENTS
>
11225 19TH AVE SE ARTESIA APARTMENTS 2023-07-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/3/2023 11:05:28 AM
Creation date
4/16/2018 9:07:42 AM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
11225
Tenant Name
ARTESIA APARTMENTS
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
316
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Type 4 Panel Enclosures <br /> Wall-Mount n r <br /> Type 4 Premier"r" cries withQuarter-Turn Latches <br /> Data Sheet and catalog Number <br /> Ff p�4 ,r <br /> ` Accessories <br /> Premier panels <br /> t� , e r" a • Security latch inserts <br /> �� r • NEMA panel adapters <br /> < " �t5r af �.: • Mounting foot kits <br /> rki Depth adjustment brackets <br /> �� �s��*' � � • EIAMA rack mounting angles <br /> • Print pockets <br /> Svving-cut panels <br /> • Padiockable or keyed handles <br /> • See Accessories section, pages 156-161 <br /> Construction <br /> • Enclosure and door are fabricated from code gauge <br /> Application steel;see tables,pages 148-151) <br /> • Mouses eiecteiccai controls and instruments • All continuous welded seams are finished smooth <br /> • Interded tor indoor or outdoo,use • Hardware kit provided contains grounding nardwere, <br /> • Protects against c.rculating and windblown;dljst,41: na, .312-18 flanged nex nuts*ar panel mounting,and sealing <br /> dirt,dripping non-corrosive liquids, rain.splashing water washers for body r�aountir�g hales <br /> and hose directed water <br /> Body Construction <br /> Standards • Body flange trough design is formed around body opening to Evert <br /> • UL 5118 Listed,Type 4 and Type 12 liquid contaminants away from door opening <br /> • cUL Listed,Type 4 and Type 12 • Reduced width flange design increases enclosure opening <br /> • Conforms to NEMA standard for Type 4 and Type 12 • Ground stud provided on enclosure body with prevision on door <br /> • Wall-mounting brackets required to maintain UII/CSA • .312-18 collar studs are provided for mounting optional Premier <br /> external mounting requirements panels � <br /> • Enclosure mounting holes in body provided for direct mounting or <br /> Finish optional mounting feet <br /> • Wash and phosphate undercoat • Utility bracket provides wire management and accessory mounting <br /> • AN 5161 gray polyester powder finish options <br /> • Available with BAL7035 Light Gray textured paint. Door Construction order add an%G"to the end of the part number <br /> as shown In the tables(pages 148-151) • Doors are secured to the body with a unique spr„g-loaded hidden <br /> hinge design on one side and slotted quarter-turn flush latch(es)or <br /> the opposite side <br /> • Doors are easily removed and interchangeable <br /> • Door has a seamless poured in-place gasket <br /> Discount Schedule: • Door opens 1700 for easy access <br /> • Utility rail provides grounding, rigidity and wire r'anagement <br /> Subclass:TCD • Window-door enclosures feature flush-Mou-itad clear polycarbonate <br /> window <br /> Notes: We can provide specai sizes,finishes and other modifications. Consult the factory for your spacial requirements. <br /> 8-1-ine series electrcal enclosures <br /> L <br />
The URL can be used to link to this page
Your browser does not support the video tag.