My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2420 39TH ST SPRINT ANTENNA 2018-04-17
>
Address Records
>
39TH ST
>
2420
>
SPRINT ANTENNA
>
2420 39TH ST SPRINT ANTENNA 2018-04-17
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2018 7:50:05 AM
Creation date
4/17/2018 7:49:58 AM
Metadata
Fields
Template:
Address Document
Street Name
39TH ST
Street Number
2420
Tenant Name
SPRINT ANTENNA
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 <br /> 1 <br /> August 22, 2017 <br /> 130 Ft Monopole Tower Structural Analysis Report CCI BU No. 815285 <br /> Project Number 85660.007.01,Application 403347, Revision 0 Page 5 <br /> 3.2) Assumptions <br /> 1) Tower and structures were built in accordance with the manufacturer's specifications. <br /> 2) The tower and structures have been maintained in accordance with the manufacturer's <br /> specification. <br /> 3) The configuration of antennas, transmission cables, mounts and other appurtenances are as <br /> specified in Tables 1 and 2 and the referenced drawings. <br /> 4) Mount areas and weights are assumed based on photographs provided. <br /> 5) Base and flange plate design methodology of the manufacturer has been reviewed and found to <br /> be an acceptable means of designing to resist the full capacity of the bolts and shaft. <br /> This analysis may be affected if any assumptions are not valid or have been made in error. B+T <br /> Group should be notified to determine the effect on the structural integrity of the tower. <br /> 4)ANALYSIS RESULTS <br /> Table 5-Section Capacity(Summary) <br /> Section Critical SF*P_allow % <br /> Elevation(ft) Component Type Size P(K) Pass/Fail <br /> No. Element (K)allow' <br /> 1 L1 130-120 Pole P30x3/8 1 -3.778 1311.060 3.9 Pass <br /> L2 120-80 Pole P30x3/8 2 -15.836 1311.060 39.3 Pass <br /> 1 L3 80-40 Pole P36x3/8 3 -27.678 _ 1490.100 86.2 Pass <br /> L4 40-0 Pole P42x1/2 4 -40.260 2410.400 84.3 Pass <br /> Summary <br /> Pole(L3) 86.2 Pass <br /> RATING= 86.2 Pass <br /> Table 6-Tower Component Stresses vs. Capacity—LC7 <br /> Notes Component Elevation (ft) % Capacity Pass I Fail <br /> 1,3 Flange Connection 80 39.3 Pass <br /> 1,3 I Flange Connection 40 86.2 Pass <br /> 1 Anchor Rods Base 85.3 Pass <br /> r 1,2 Base Plate Base 86.2 Pass <br /> 1 Base Foundation (Structure) Base 53.3 Pass <br /> 1 Base Foundation (Soil Interaction) Base 19.3 Pass <br /> Structure Rating (max from all components)= 86.2% <br /> Notes: <br /> 1) See additional documentation in"Appendix C—Additional Calculations"for calculations supporting the%capacity <br /> consumed. <br /> 2) Base plates have the same capacity as their respective bolt. <br /> 3) Flange plates have the same capacity as their respective shaft. <br /> 4.1) Recommendations <br /> The tower and its foundation have sufficient capacity to carry the final load configuration. No <br /> modifications are required at this time. <br /> tnxTower Report-version 7.0.5.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.