Laserfiche WebLink
� GENERAL NOTES KeyPlan <br /> 1.ALL CONSTRUCTION SHALL COMPLY WITH THE(20951BC WITH WAC 51-50,2015IEBCWI7H DIMENSION: A��ITIONAL GENERAL CONTRACTOR RESPONSIBILITY: 1.THE GENERAL CONTRACTOR SHALL PROVIDE SUBMITTALS FOR REVIEW&APPROVAL BY <br /> WAC 51-50,AND WAC 51-11),AND ALL APPLICABLE LOCAL CODES,ORDINANCES ,AND 1.ALL WFORh.4ATI0N SHOWN ON THE�RAW WGS RELATIVE TO EXISTING CONDITIONS IS 1.GENERAL CONTRACTOR IS RESPONSIBLE TO PROVIDE FINAL AS BUILT DRAWWGS INCLUDING UNISPACE.G C IS TO PROVIDE TWO SAMPLES OF THE SPECIFIED MATERIALS.SUBA4ITTALS <br /> STANDARDS. IN CASE OF ANY CONFLICT WHERE THE METHODS OR STAN�ARDS OF GIVEN AS THE BEST PRESENT KNOWLEDGE BUT WITHOUT GUARANTEE OF ACCURACY. DO ARCHITECTURAL, MECHANICAL,ELECTRICAL, PLUMBING AND LIFE SAFETY TO CLIENT IN FINAL SHALL INCLUDE BUT NOT BE LIMITED TO THE FOLLOWING: DRAW DOWNS OF ALL PAINTS, <br /> WSTALLATION OF THE MATERIALS SPECIFIED DO NOT EQUAL OR EXCEE�THE NOT SCALE DRAWINGS.THE CONTRACTOR SHALL VERIFY EXISTING CON�ITIONS AND CLOSE OUT DOCUMENTS. SAMPLES OF ALL CARPETS,ALL SPECIFIED FLOOR BASE,SAMPLES OF ALL WALL FINISHES, �->,. <br /> REQUIREMENTS OF THE LAWS OF ORDINANCES,THE LAWS OR ORDINANCES SHALL GOVERN. DIMENSIONS AND SHALL NOTIFY UNISPACE OF ANY DISCREPANCIES OR CONDITIONS OR 2.THE CONTRACTOR WILL INSPECT THE PREMISES IMMEDIATELY TO CHECK EXISTING WORKWG SAMPLES OF SPECIFIED CABINET FINISHES, SAMPLES OF CEILWG GRID&CEILING TILE, �` _ <br /> NOTIFY THE ARCHITECT OF ALL CONFLICTS. CONDITIONS ADVERSELY EFFECTING THE DESIGN PRIOR TO PROCEEDING WITH THE CONDITIONS.SHOULD THE CONTRACTOR FIND CONDITIONS WHICH HEISHE BELIEVES WOULD PACKAGES OF LIGHTING SUBMITTALS,DOOR&HARDWARE,MILLWORK SHOP DRAWINGS. �` <br /> 2.THESE DRAWINGS AND SPECIFICATIONS ARE THE PROPERTY AND COPYRIGHT OF THE WORK. IMPEDE HISIHER WORK,THEN SUCH CONDITIONS MUST BE REPORTED IMMEDIATELY TO THE MILLWORK HARDWARE SUBMITTALS, ETC PROVIDE(3) 12"X12"WOOD VENEER SUBMITTALS. <br /> ARCHITECT OF RECORD AND SHALL NOT BE REPROOUCED OR USED FOR ANY OTHER 2.DIMENSIONS OF PLANS ARE TYPICAL TO THE CENTERLINE OF COLUMNS AND FINISH GWB OWNER. FAILURE TO SO ADVISE WILL CONSTITUTE NOTICE THAT THE CONTRACTOR IS FULLY 2.THE GENERAL CONTRACTOR SHALL WCLUDE IN HISIHER ESTIMATE ALL COSTS,(WCLUDING <br /> PURPOSE EXCEPT BY WRITTEN AGREEMENT. FACE OF PARTITIONS, UNLESS NOTED OTHERWISE.DOOR CASED OPENINGS WITHOUT SATISFIED WITH THE EXISTING CONDITIONS AND THAT HEISHE INTENDS TO PERFORM HIS(HER OVERTIME WORK)FOR REMOVAL,NEW INSTALLATION&REINSTALLATION WORK FOR ANY Genera�Nmes <br /> 3.SECURE RELEVANT CITY AND STATE APPROVALS RELATING TO FIRE,CONSTRUCTION, LOCATION DIMENSIONS ARE TO BE FOUR 4 INCHES FROM THE FACE OF THE ADJACENT OBLIGATIONS WITH NO ALLOWANCE EITHER IN TIME OR MONEY FOR ANY IMPEDIMENTS TO PLUMBING; CEILING TAKE-DOWN&REINSTALLATION ,ELECTRICAL,TELEPHONE Flu wnrk to becarried outin accomance wim the uS�ntemarona�eui�ding coae,�oca� <br /> � � ( � Bullding Codes and Safety Regulalions,Water,Elechicity regulafions and all o�har <br /> LABOR,HEALTH AND LICENSING.CONTRACTOR SHALL FURTHER POST ALL BONDS AND PARTITION OR CENTERED BETWEEN PARTITIONS. THIS WORK. COMMUNICATIONS EQUIPMENT OR HVAC WORK ON CEILWG PLENUM. re�evantnumodties requirement concerned <br /> SECURE ALL INSURANCE REQUIRED BY LAW OR CONTRACT, FORWARDING PROOF OR SUCH 3.ALL ANGLES ARE AT 90 OR 45 DEGREES UON. 3.THE CONTRACTOR SHALL SUPERVISE AND DIRECT THE WORK USING HISlHER BEST SKILL 3.THE GENERAL CONTRACTOR SHALL MAINTAIN A CURRENT&COMPLETE SET OF /+u work to be carried o�t in a pro�essro�a�s�or�ma�smp�ike ma��er accordiog ro me <br /> ACTIONS TO THE LANDLORD PRIOR TO COMMENCEMENT OF CONSTRUCTION. AND ATTENTION.HEISHE SHALL BE SOLELY RESPONSIBLE FOR ALL CONSTRUCTION,ANDIOR CONSTRUCTION DRAWINGS ON SITE DURING ALL PHASES OF CONSTRUCTION FOR USE BY ALL plans8 specification <br /> Do no[scale oHthe drewings unless otherwise sta�ed and use figuretl dlmensionsln <br /> 4.WORK NOT INCLU�ED IN THIS CONTRACT SHALL BE MARKED"N.LC."OR SPECIFICALLY CONSTRUCTION: INSTALLATION MEANS, METHODS,TECHNIQUES; SEQUENCES OR PROCEDURES AND FOR TRADES. preterence. <br /> ASSIGNED TO ANOTHER PARTY. 1.GENERAL CONTRACTOR SHALL NOTIFY ARCHITECT ABOUT SITE CONDITIONS THAT COORDINATING ALL PORTIONS OF THE WORK UNDER THIS CONTRACT. 4.ALL EXISTING APPURTENANCES NOT BEING REMOVED SHALL BE REFURBISHED WHERE nu dimensionsare to be cnecked 8 verieed on site betore me commencementorany <br /> 5.CONTRACTORS SHALL VISIT SITE,REVIEW THE DRAWINGS AS SUBMITTED BY THE REQUIRE ADDITIONAL INTERIOR WALLS SUPPORT OR STRUCTURAL DETAILS. 4ALL WORK SHALL BE EXECUTED IN A NEAT AND WORKMANLIKE MANNER ACCEPTABLE TO REQUIRED.ANY LOOSE ITEMS TIGHTENED(CEILING EXIT SIGNS,ETC.)&ANY MISSING PARTS work au dimensions 8�eve�sare subject ro sna�sun�ey and setam <br /> ARCHITECT,AND BECOME THOROUGHLY FAMILIAR WITH THE SITE CON�ITIONS PRIOR TO 2.WVESTIGATE AND VERIFY LOCATIONS OF EXISTING STRUCTURAL, PLUMBING. THE OWNER. REPLACED BY THE GENERAL CONTRACTOR TO ACHIEVE A FINISHED FIRST CLASS Thisdrawing&design is ihe pmperty otme design group no�ed on mis sheetand <br /> should not be repmduced either in parYor whole without the wrillen consen�of�his tirm. <br /> BIDDING OR CONSTRUCTION. MECHANICAL,AND ELECTRICAL ELEMENTS AND OTHER EXISTING CONDITIONS AND S.UNLESS OTHERWISE SPECIFICALLY NOTED,THE CONTRACTOR SHALL PROVIDE AND PAY WSTALLATION&APPEARANCE. <br /> 6.ALL WORK SHALL BE APPLIED IN ACCORDANCE WITH THE MANUFACTURER'S LATEST NOTIFY THE ARCHITECT OF NAY AND ALL DISCREPANGIES PRIOR TO PROCEEDING WITH FOR ALL LABOR, MATERIALS, EQUIPMENT,TOOLS,CONSTRUCTION EQUIPMENT,AND 5.ALL REQUIRED EXITS,WAYS OF APPROACH THERETQ&WAYS OF TRAVEL FROM THE EXIT <br /> RECOMMENDATIONS OR WRITTEN DIRECTIONS. THE WORK. MACHWERY,TRANSPORTATION,OTHER FACILITIES AND SERVICES NECESSARY FOR PROPER INTO THE STREET SHALL CONTINUOUSLY BE MAWTAINED FREE FROM ALL OBSTRUCTIONS& Consunants <br /> 7,WHERE CONSTRUCTION DETAILS ARE NOT SHOWN OR NOTED FOR ANY PART OF THE WORK, 3 COOR�INATE CONSTRUCTION SCHEDUL�NG WITH BUILDING OWNER TO ALLOW ONGOING EXECUTION OF THE COMPLETION OF THE WORK.THE CONTRACTOR WARRANTS TO THE IMPEDIMENTS FOR UNOBSTRUCTED EGRESS IN THE CASE OF FIRE OR OTHER EMERGENCY. <br /> THE DETAILS SHALL BE THE SAME AS FOR OTHER SIMILAR WORK. OPERATION OF THE FACILITY DURING CONSTRUCTION. OWNER AND BUILDING MANAGEMENT THAT ALL MATERIALS AND EQUIPMENT FURNISHED DURING THE ENTIRE PERIOD OF DEMOLITION AND CONSTRUCTION,ALL EXISTWG EXITS, EXIT <br /> S.WHERE DEVICES OR ITEMS OR PARTS THEREOF ARE REFERRED TO IN SINGULAR, IT IS 4.PROVIDE BLOCKING AS REQUIRE�FOR WALL AND CEILING MOUNTED ITEMS UN�ER THIS CONTRACT WILL BE NEW UNLESS OTHERWISE SPECIFIED,AND THAT ALL WORK LIGHTING, FIRE PROTECTNE DEVICES AND ALARMS SHALL BE CONTINUOUSLY MAINTAINE�. <br /> INTENDED THAT SUCH SHALL APPLY TO AS MANY SUCH DEVICES, ITEMS OR PARTS AS ARE S.OFFSET STUDS WHERE REQUIRED SO THAT FINISH WALL SURFACES WILL BE F�USH. WILL BE GOOD QUALITY, FREE FROM FAULTS AND DEFECTS AND W CONFORMANCE WITH THE 6.EACH CONTRACTOR SHALL MAKE ALL REQUIRED ARRANGEMENTS FOR DELIVERY OF <br /> REQUIRED TO PROPERLY COMPLETE THE WORK. 6 PROVIDE GALVANIC ISOLATION BETWEEN DISSIMILAR METALS. CONSTRUCTION DOCUMENTS.ALL WORK NOT SO CONFORMING TO THESE STANDARDS MAY EQUIPMENT&!OR MATERIALS IT SHALL BE THE RESPONSIBILITY OF EACH CONTRACTOR TO <br /> 9.VERIFY ALL"BUILDING STANDAR�S"WITH BUIL�ING OWNER PRIOR TO BEGINNING ANY WORK. 7.PATCH AND REPAIR ALL EXISTING SURFACES AS REQUIRED BY DEMOLITION AND NEW BE CONSI�ERED DEFECTIVE. IT IS UNDERSTOOD THAT NO INFERIOR OR NON-CONFORMING CHECK THE RULES&REGULATIONS GOVERNING WORK ON THE PREMISES, INCLUDING THE <br /> HOWEVER,THERE SHALL BE NO DEVIATIONS WHATSOEVER FROM THE CONTRACT CONSTRUCTION TO RECEIVE NEW SCHEDULE FINISHES.ALL SURFACES ARE TO HAVE WORK OF THE MATERIALS WILL BE ACCEPTED WHETHER DISCOVERED AT THE TIME THEY FOLLOWING: <br /> DOCUMENTS WITHOUT THE ARCHITECT'S WRITTEN APPROVAL THEREOF.THE CONTRACTOR "LIKE-NEW"APPEARANCE. ARE INCORPORATED IN THE WORK OR AT ANY TIME BEFORE OR AFTER THE FINAL A. DATE&TIME OR DELIVERY SHALL BE ESTABLISHED IN CONJUNCTION WITH THE <br /> AGREES TO DEFEND, INDEMNIFY,AND HOLD THE ARCHITECT HARMLESS FROM ANY CLAIMS 8.STUD HEIGHT AND SPACING LIMITATION OF STEEL FRAMING COMPONENTS SHOULD BE IN ACCEPTANCE. IF REQUIRED BY THE OWNER,THE CONTRACTOR SHALL FURNISH PERSON HAVING JURISDICTION OVER PREMISES.OVERTIME CHARGES&IOR ANY <br /> ARISING AS A RESULT OF UNAPPROVED CHANGES. COMPLIANCE WITH ASTM C 754 FOR MAXIMUM DEFLECTION AND MINIMUM LATERAL SATISFACTORY EVIDENCE AS TO THE KIND AND INSTALLATION OF MATERIALS AND NECESSARY EXPENSE SHALL BE PAID BY CONTRACTOR REQUIRING SERVICE. <br /> 10. LOCATE ALL EXISTING UTILITIES WHETHER SHOWN HEREON OR NOT AND TO PROTECT LOADING REQUIREMENTS. EQUIPMENT. B. BUILDING CONDITIONS, INCLUDING SIZE&LOADING CAPACITY OF ELEVATORS,SIZE OF <br /> THEM FROM DAMAGE.THE CONTRACTOR SHALL BEAR ALL EXPENSE OF REPAIR OR 9.ALL DEMOLISHED MATERIALS TO BE RECYCLED BY AN APPROVED RECYCLER 6.THE WARRANTIES AND GUARANTEES PROVIDED IN THE CONSTRUCTION DOCUMENTS SHALL DOORWAYS,CORRIDORS,WINDOW OPENINGS, ETC..SHALL BE CHECKED BY THE <br /> REPLACEMENT OF UTILITIES OR OTHER PROPERTY DAMAGED BY OPERATIONS IN BE IN ADDITION TO AND NOT IN LIMITATION OF ANY OTHER WARRANTY AND GUARANTY OR CONTRACTOR BEFORE DELIVERY TO ASSURE ITEMS WILL FIT INTO SPACE. <br /> CONJUNCTION WITH THE EXECUTION OF THIS WORK. LIPE SAFETY: REMEDY REQUIRED BY LAW OR THE CONSTRUCTION DOCUMENTS. C. ALL CHARGES INVOLVING THE INSTALlATION&!OR OPERATION OF A HOIST SYSTEM, IF <br /> 11.VERIFY AND CONFORM TO ALL RE�UIREMENTS OF ALL UTILITY COMPANIES UNLESS 1 JF NECESSARY,PROVIDE FIRE PROTECTION AT ALL PENETRATIONS OF FIRE RELATED 7ALL WORK SHALL BE GUARANTEED FOR A PERIOD OF ONE (1)YEAR AFTER COMPLETION REQUIRED,SHALL BE BORNE BY THE CONTRACTOR USING THE SYSTEM.CHARGES <br /> OTHERWISE NOTED�N THE PLANS OR SPECIFICATIONS. ELEMENTS AS REQUIRE�BY CODE. UNLESS OTHERWISE SPECIFIED,AND SHALL BE SO STATED IN CONTRACTOR'S WRITTEN INVOLVING THE TEMPORARY REMOVAL 8 REINSTALLATION OF WINDOW SASH$IOR <br /> 12.ALL DEBRIS SHALL BE REMOVE� FROM PREMISES AND ALL AREAS SHALL BE LEFT IN A 2.FIRE EXTINGUISHERS:VERIFY LOCATION,TYPE,AND SIZE PER FIRE MARSHAL PROPOSAL AGREEMENT.ALL REPAIRS,CORRECTIONS, DISCREPANCIES,ETC., MUST BE FIXED PANELS REQUIRED FOR DELIVERY SHALL BE BORNE BY THE CONTRACTOR. <br /> CLEAN CONDITION AT ALL TIMES. RE�UIREMENTS CONTRACTOR TO PROVIDE ALL TEMPORARY AND PERMANENT FIRE MADE WITHOUT ANY ADDITIONAL COST TO THE OWNER,AND WITHIN FIVE(5)DAYS AFTER 26.THE GENERAL CONTRACTOR, SUBCONTRACTOR&TENANTS CONTRACTOR SHALL SUBMIT <br /> 13. PROTECT ADJACENT WORK AND REPAIR ANY DAMAGE AT CONTRACTOR'S OWN EXPENSE. EXTMGUISHERS REQUIRE�UNDER N F P A 10 MOST RECENT E�ITION AN�APPROVED BY NOTICE IS GIVEN. CERTIFICATES TO THE BUILDING MANAGER&OWNER UPON COMPLETION OF WORK, INCLUDING <br /> 14.THE CONTRACTOR SHALL BE RESPONSIBLE FOR SAFETY IN THE AREA OF WORK IN THE FIRE MARSHAL CONRRM ACCESSIBILITY OF LOCATION WITH RRE ALARM PRIOR TO 8.THE ARCHITECT AND THE ARCHITECT'S CONSULTANTS SHALL NOT HAVE ANY RESPONSIBILITY BUT NOT LIMITED TO THE FOLLOWING: <br /> ACCORDANCE WITH ALL APPLICABLE SAFETY CODES. WSTALLATION. PROVIDE FINISHED CA81NET5 TO MATCH BUILDING STANDARD FOR FOR THE DISCOVERY,PRESENCE,HANDLING, REMOVAL OR DISPOSAL OF OR EXPOSURE OF A. FIREPROOF WOOD TEST REPORT(IF REQUIRE�j <br /> 15.THE CONTRACTOR SHALL INDEMNIFY AND HOLD THE BUILDING EXTINGUISHERS AT ALL EXPOSED LOCATIONS. PERSONS TO HAZARDOUS MATERIALS IN ANY FORM AT THE PROJECT SITE,INCLUDING, BUT B. ELECTRICAL, PLUMBING &AIR CONOITIONING CERTIFICATES ISSUED BY: <br /> OWNERIARCHITECUENGINEER HARMLESS FOR INJURY OR DEATH TO PERSONS OR FOR 3.FIRE EXTINGUISHERS AND CABINETS SHOULD BE LOCATED SO THAT THE TOP OF THE NOT LIMITE�TO ASBESTOS PRODUCTS,POLYCHLORINATED BIPHENYL(PCB)OR OTHER TOXIC -0EPARTMENT OF WATER SUPPLY,GAS&ELECTRICITY <br /> DAMAGE PROPERTY CAUSE�BY THE NEGLIGENCE OF THE CONTRACTOR,HISIHER AGENTS, EXTINGUISHER OR CABINET IS NO HIGHER THAN 48"AFF AND THE TOP OF THE SUBSTANCES. -BOARD OF RRE UNDERWRITERS <br /> EMPLOYEES. OR SUBCONTRACTORS. EXTINGUISHER OR CABINET HAN�LE IS AT LEAST 36"AFF. 9.THE GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTION,STANDARDS FORM OF <br /> 16.APPROVED PLANS SHALL BE KEPT IN A PLAN BOX AND SHALL NOT BE USED BY ANY 4.AT SEMI-RECESSED FIRE EXTINGUISHER CABINETS WRAP ADDITIONAL LAYER(S)OF TYPE THE AMERICAN INSTITUTE OF ARCHITECTS,CURRENT EDITION,SHALL APPLY TO ALL WORK IN <br /> WORKERS.ALL CONSTRUCTION SETS SHALL REFLECT THE SAME INFORMATION AS WELL AS 'X'GYPSUM WALL BOARD INTO THE CABINET CAVITY TO MAINTAIN SPECIFIED FIRE RATED THIS CONTRACT, EXCEPT AS SPECIFICALLY MODIFIED BELOW&IOR BY THE AGREEMENT. <br /> ALL REVISIONS,ADDENDA,AN�CHANGE OR�ERS.THE CONTRACTOR SHALL ALSO MAINTAIN REQUIREMENT REFER TO WALL CONSTRUCTION LEGEND FOR ADDITIONAL INFORMATION. 10.PRIOR TO BEGINNING ANY WORK THE GENERAL CONTRACTOR SHALL FURNISH A <br /> IN GOOD CONDITION,ONE COMPLETE SET OF PLANS WITH ALL REVISIONS,ADDENDA,AND 5.PROVIDE AND WSTALL FIRE EXTINGUISHER SIGNAGE (5°X6")ABOVE EACH FIRE CONSTRUCTION SCHEDULE SHOWING THE CHRONOLOGICAL PHASE OF HISlHER WORK &ALL <br /> CHANGE ORDER,ON THE PREMISES AT ALL TIMES WHICH ARE TO BE UNDER THE CARE OF EXTINGUISHER OR CABINET CAVITY TO MAINTAIN SPECIFIED FIRE RATED REQUIREMENT RELATED WORK FOR THE COMPLETION OF THE PROJECT.THIS SCHEDULE SHALL INDICATE <br /> THE JOB SUPERINTENDENT. REFER TO WALL CONSTRUCTION LEGEND FOR ADDITIONAL INFORMATION. ALL ORDERING LEAD TIMES,LENGTH OF TIME FOR EACH PHASE, ITS START&COMPLETION; <br /> 17.PROVIDE COMPLETE SECURITY OF THE TENANT SUITE WHILE JOB IS IN PROGRESS AND 6.EXIT SIGNS AND EXIT ILLUMINATION SHALL CONFORM TO THE 20i516C W17H WAC 51-50 8 WITH A PROJECTED COMPLETION DATE. <br /> UNTIL THE JOB IS COMPLETE. 20151EBC W1TH WAC 51-50 AND EVERETT FIRE MARSHALL REQUIREMENTS.CONTRACTOR 11.ALL UNISPACE DRAWINGS 8 ALL CONSTRUCTION NOTES ARE COMPLEMENTARY.& WHAT IS <br /> 18.AT COMPLETION OF THE WORK,REMOVE ALL DEBRIS FROM THE SITE, LEAVING SPACE TO PROVIDE AND INSTALL EMERGENCY LIGHTING AND EXIT LIGHTING AS REQUtRED BY CALLED FOR BY EITHER WILL BE BINDING AS IF CALLED FOR BY ALL ANY WORK SHOWN OR <br /> CLEAN,WASH ALL WINDOWS AND GLASS, POLISH ALL HARDWARE AND FIXTURES.REPLACE THE EVERETT FIRE AND BUILDING �EPARTh9ENTS. CONFIRM ACCEPTABILITY OF REFERRE�TO ON ANY ONE SET OF DRAWINGS SHALL BE PROVIDED AS THOUGH SHOWN ON <br /> AND PATCH AREAS OF CEILWG DAMAGED DUE TO LIGHTING INSTALLATION OR MECHANICAL LOCATIONS WITH FIRE MARSHAL BEFORE INSTALLATION CONTRACTOR SHALL PROVIDE ALL RELATED DRAWINGS. <br /> A�JUSTMENT. AND INSTALL AUDIBLE ALARMS IN ACCORDANCE WITH(10?51BC W1TH WAC 51-50 8 2015 12.BEFORE SUBMITTING A PROPOSAL,ALL CONTRACTORS SHALL VISIT THE PREMISES; <br /> 19.MINIMIZE DISRUPTIONS OF BUILDING OCCUPANTS�UE TO NOISE ODOR FUMES,OR 1EBC WITH WAC 51-50).CONTRACTOR SHALL PROVIDE AND INSTALL ALL SMOKE FAMILIARIZE THEMSELVES WITH EXISTING CONDITIONS&SATISFY THEMSELVES AS TO THE <br /> VIBRATION.AT THE EN�OF CONSTRUCTION THE CONTRACTOR SHALL COMPLETELY CLEAN DETECTORS AND SMOKE DETECTION AS REQUIRED UNDER CHAPTER 7 OF THE 20( 151BC NATURE&SCOPE OF THE WORK&THE DIFFICULTIES THAT ATTEND TO ITS EXECUTION. THE <br /> ALL AREAS SOILED BY CONSTRUCTION ACTIVITIES INCLUDWG THOSE IN WHICH NO WORK WITH WAC 51-50 8 20?51EBCW77HWAC 51-50).THE INSTALLATION OF THE ABOVE NOTED SUBMISSION OF A PROPOSAL SHALI BE CONSTRUED AS EVIDENCE THAT SUCH AN <br /> WAS DONE SYSTEM SHALL INCLUDE THE CONNECTION TO ANDIOR MODIfICATION OF THE EXISTING EXAMINATION HAS BEEN MADE&LATER CLAIMS FOR LABOR, EQUIPMENT,OR MATERIAL <br /> 20.LATHING.PLASTER,AND GYPSUM WALL BOARD SYSTEMS SHALL CONFORM TO CHAPTER BUILDING SYSTEMS,AS NECESSARY. REQUIRED FOR�IFFICULTIES ENCOUNTERED,WHICH COULD HAVE BEEN FORESEEN HAD <br /> 25 OF THE INTERNATIONAL BUILDING CODE. 7.EXIT DOORS SHALL BE OPERABLE FROM THE INSIDE WITHOUT THE USE OF A KEY OR ANY SUCH AN EXAMINATION BEEN MADE,WILL NOT BE RECOGNIZED. <br /> 21.ALL GLASS AND GLAZING SHALL COMPLY WITH THE(2015lBC WITH WAC 51-50&2095 fEBC SPECIAL KNOWLEDGE OR EFFORT. 13.ALL CONTRAGTORS SHALL CONTACT THE BUILDING MANAGEMENT TO DETERMWE THE <br /> WITN WAC 51-50) AND THE U S PRODUCT SAFETY COMh91SSI0N:SAFETY STANDARDS FOR 8.FLAMMABLE LIQUIDS SHALL NOT BE PLACED;STORED,OR DISPENSED IN THIS RULES OF THE BUILDING OWNER FOR CONSTRUCTION TO DETERMINE WHEN&HOW <br /> ARCHITECTURAL GLAZING MATERIALS(42 FR 1426:16 CFR PART 1201). OCCUPANCY EXCEPT AS PROVIDED IN NFPA STANDARD 30 AND THE(201518C WfTHWAC DELNERIES CAN BE MADE(SEE BELOW),WHAT PHASES OF CONSTRUCTION CAN BE DONE <br /> 22.VERIFY ALL�OOR AND WINDOW ROUGH OPENING DIMENSIONS WITH DOOR AND WINDOW 5?-50 8 20151EBC WITHWAC 59-501.PERMIT MAY BE REQUIRED. ON REGULAR OR OVERTIME,&IN GENERAL ANY SPECIAL BUILDWG REQUIREMENTS WHICH <br /> MANUFACTURERS. 9ALL DRAPES,HANGINGS,CURTAINS,AND ALL OTHER�ECORATNE MATERIALS THAT WILL AFFECT THEIR WORK(IF OVERTIME WORK IS REQUIRED BY ANY TRA�E,APPROVAL <br /> 23.CONSTRUCTION WALLS PLUMB AND SQUARE WITH EXISTING STRUCTURE AND NEW WOULD TEND TO INCREASE THE FIRE AND PANIC HAZARD SHALL BE MADE FROM MUST BE OBTAINED PRIOR TO THE EXECUTION OF ANY WORK INCLUDING COST).THE <br /> CONSTRUCTION UON. NONFLAMMABLE MATERIAL,OR SHALL BE TREATED AND MAINTAINED IN A FIRE GENERAL INTENT IS THAT ALL CONSTRUCTION WORK SHALL BE DONE ON REGULAR TIME <br /> 24.COORDINATION:THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR THE RETARDANT CONDITION BY MEANS OF A FLAME RETARDANT SOLUTIONS OR PROCESS EXCEPT NOISE GENERATING CONSTRUCTION. <br /> VERIFICATION AND COORDINATION OF THE WORK OF ALL TRADES TO ASSURE COMPLIANCE APPROVED BY THE FIRE MARSHAL.PROVIDE A CERTIFICATION TO THIS EFFECT. EXIT 14.THE GENERAL CONTRACTOR, HISIHER SUBCONTRACTOR&ANY OTHER CONTRACTOR <br /> WITH THE DRAWINGS. DOORS, EXIT LIGHTS;AND FIRE EXTINGUISHER LOCATIONS SHALL NOT BE CONCEALED OR INVOLVED IN THIS PROJECT SHALL TAKE NOTE THAT ANY COST CAUSED BY DEFECTIVE OR <br /> 25.ALL CONSTRUCTION AND DESIGN TO BE IN COMPLIANCE WITH UNISPACE DESIGN AND OBSTRUCTED BY ANY DECORATIVE MATERIAL.MINIMUM FLAME SPREAD CLASSIFICATION ILL-TIMED WORK AS A RESULT OF,BUT NOT LIMITED TO INFERIOR WORKMANSHIP OR <br /> CONSTRUCTION GUIDELINES. OF INTERIOR FINISHES SHALL CONFORM TO THE(20?51BC WITH WAC 51-50 8 20951EBC MATERIALS, IMPROPER SCHEDULING OR DELINQUENT ORDERING SHALL BE BORNE 8Y THE <br /> 26.REFER TO CLIENT'S BID FORMS AND EXECUTED CONTRACT FOR CONSTRUCTION FOR FULL W17H WAC 51-501. PARTY RESPONSIBLE THEREFORE. <br /> LIST OF CONTRACT DOCUMENTS. 10.ALL REQUIRED FIRE DOORS SHALL BEAR A LABEL FROM A RECOGNIZED AGENCY 15.THE USE OF THE WORDS"PROVIDE"OR"PROVIDED"IN CONNECTION WITH ANY ITEM <br /> 27.THE DRAWINGS,CLIENT'S STANDARD SPECIfICATIONS,AND ALL OTHER CONTRACT SHOWING THE SPECIFIC RATING. SPECIFIED IS INTEN�ED TO MEAN, UNLESS OTHERWISE NOTED,THAT WHICH SHALL BE <br /> DOCUMENTS ARE COMPLEMENTARY.WHERE CONFLICTS OR DIFFERENCES OCCUR FURNISHED&INSTALLED,&CONNECTED WHERE SO REQUIRED. <br /> CONTRACTOR SHALL BRING THEM TO THE ATTENTION OF UNISPACE DURING BID.WHERE 16.WHERE THE TERMS"APPROVED EQUAL","OTHER APPROVED", "EQUAL TO", <br /> DIFFERENCES ARE NOT BROUGHT TO UNISPACE'S ATTENTION DURING BID,THE COSTLIER OR "ACCEPTABLE"OR THE OTHER GENERAL QUALIFYWG TERMS ARE USED IN THESE NOTES, IT <br /> MORE RESTRICTIVE SHALL BE DEEMED THE CONTRACT REQUIREMENT. SHALL BE UNDERSTOOD THAT REFERENCE IS MA�E TO THE RULING&JUDGMENT OF <br /> 28.THE CONTRACTOR SHALL NOTIFY UNISPACE OF ANY DISCREPANCIES BETWEEN THE UNISPACE. <br /> CONSTRUCTION DOCUMENTS AND ANY FIELD CONDITIONS,WHICH MAY CAUSE DEVIATION <br /> FROM THE CONSTRUCTION DOCUMENTS,PRIOR TO SUBMITTING BIDS. <br /> STANDARD ABBREVIATIONS GENERAL SYMBOLS S`am° <br /> ����� <br /> � �������� <br /> �������� <br /> & -AND GA-GAUGE PERF- PERFORATED - ' `° <br /> @ -AT GALV-GALVANIZED PERP-PERPENDICULAR "�� PROJECT NORTH � SIM - REF. TYPE (IF APPLICABLE) f �, E o5115/2017 <br /> � - CENTER LINE GB-GRAB BAR PL-PLATE TRUE NORTH � 6_22 DETAIL SECTION NUMBER . � �_-�^ � � � <br /> # - POUND GC-GENERAL CONTRACTOR PLBG-PLUMBWG °L§p'� ���°� <br /> ± -TOLERANCEDIMENSION GEN -GENERATOR PR-PAIR SHEETNUMBER s°��r� r� m��s�:�a�°rrrx <br /> GFRC -GLASS FIBER REWFORCED CONCRETE PREFAB -PREFABRICATED N,�,� AREA NOT IN CONTRACT ��,� <br /> AlE -ARCHITECT/ENGINEER GFRG-GLASS FIBER REINFORCED GYPSUM PT- PRESSURE TREATED �2 � GRID LWE NUMBER <br /> ACT-ACOUSTIC CEILING TILE GL-GLASS PTD-PAINTED <br /> ADA-THE AMERICANS WITH DISABILITIES ACT GWB -GYPSUM WALL BOARD PVC -POLYVINYL CHLORIDE RM.NAME ROOM NAME LEVEL�� LEVEL NAME <br /> ADJ -ADJACENT 101 ROOM/AREA NUMBER 12'-6" <br /> AFF-ABOVE FINISHED FLOOR HB -HOSE BIBB QTY-QUANTITY 150 SF� � <br /> AH -AIR HANDLER HC-HOLLOW CORE -AREA LEVEL ELEVATION <br /> ALT-ALTERNATE HT-HEIGHT R-RADIUS OR(STAIR) RISERS ,,,,� Q REVISION NUMBER <br /> APPROX-APPROXIMATELY HM -HOLLOW METAL RAD- RADIATOR � � � SIM�REF.TYPE (IF APPLICABLE) <br /> ARCH -ARCHITECT HO-HOLD OPEN RCP- REFLECTED CEILING PLAN � � 6_zz DETAIL REFERENCE NUMBER .� �i -HEIGHT ABOVE <br /> HORIZ-HORIZONTAL RD -ROOF DRAIN ( � DETAIL REFERENCE SHEET � X�-X��--� SLAB, UON <br /> BD -BOARD HP -HIGH POINT REF-REFERENCE .-+ <br /> BLDG- BUILDING HVAC-HEAT, VENTILATION &AIR CONDITIONWG REFR- REFRIGERATOR `�---AREA OF DETAIL <br /> ALIGN � qLIGN TO INDICATED <br /> BM-BEAM REINF- REINFORCED OR REINFORCING � SURFACES <br /> ID - INSIDE DIAMETER REQD -REQUIRED q sIM- -REF.TYPE (IF APPLICABLE) <br /> CAB-CABINET IN - INCH OR INCHES RH - RIGHT HAND EXTERIOR ELEVATION NUMBER O SHEET-KEYNOTES <br /> CG-CORNER GUARD INSUL- INSULATION RHR-RIGHT HAND REVERSE A1-101 <br /> CLG-CEILING INT- INTERIOR RM -ROOM SHEET NUMBER <br /> CLR-CLEAR RO-ROUGH OPENING � r� CENTER LINE <br /> CMU -CONCRETE MASONRY UNIT JAN-JANITOR RWL-RAIN WATER LEADER ELEVATION NUMBER TYP. <br /> COL-COLUMN 1 �`A2-222 1� <br /> CONC-CONCRETE KD-KNOCKED DOWN SAFB-SOUND ATTENUATION FIBER BLANKET SHEET NUMBER Rev oescRiPTioN o�, e av cHK <br /> CONF-CONFERENCE KO-KNOCKOUT SF-SQUARE FOOT OR FEET � <br /> CONT-CONTINUOUS SIM -SIMILAR 3 �I�r�,M��^ <br /> CYL-CYLINDER L- LENGTH OR LEFT SK-SINK � siM �REF.TYPE (IF APPLICABLE) �� �� 1� =�� <br /> LAB-LABORATORY SM-SMALL I ' �r��r� <br /> DEMO-DEMOLITION LAM - LAMINATE SPEC -SPECIFICATIONS s-22 SECTION NUMBER <br /> DEPT- DEPARTMENT LAV-LAVATORY SQ-SQUARE � -SHEET NUMBER <br /> 5t ve., wte <br /> Seattle WA 98104 USA <br /> DIA-DIAMETER LB-POUND ST-STREET +� 2os 2�0 7aoo <br /> DIM - DIMENSION LF- LINEAR FOOT OR FEET STC-SOUND TRANSMISSION CLASS www unispace.com <br /> DISP-DISPENSER LH -LEFT HAND STD-STANDARD ,;-; ; <br /> DN-DIVISION LHR- LEFT HAND REVERSE STG -STORAGE ` ' <br /> DN-DOWN LIN-LINEAR STL-STEEL c�ient t Pro�ect Name�nddress � <br /> DWG -DRAWING LP-LOW POINT STN -STONE _ <br /> LTG -LIGHTING STR-STRUCTURAL <br /> E FSE EXTERIOR INSULATION FINISH SYSTEM MACH -MACHINE T-TREADS(STAIRS) POD B � <br /> EJ -EXPANSION JOINT MAX-MAXIMUM T&G -TONGUE AND GROOVE 6920 SEAWAY BLVD � <br /> EL-ELEVATION MDF-MEDIUM DENSITY FIBERBOARD TBD -TO BE DETERMINED EVERETT; WA 98203 z <br /> ELEC-ELECTRICAL MECH -MECHANICAL TEL -TELEPHONE " <br /> ��' <br /> ELEV-ELEVATOR MFR-MANUFACTURER TEMP-TEMPORARY � <br /> EMER- EMERGENCY MIN-MINIMUM TOFF-TOP OF FINISHED FLOOR Drawing Title: � <br /> ENGR-ENGINEER MIR-MIRROR T.O. -TOP OF � <br /> EP-ELECTRICAL PANEL MISC- MISCELLANEOUS TPO -THERMOPLASTIC-POLYOLEFIN ROOFING G E N E RAL N OTES� a <br /> EPDM- ETHYLENE PROPYLENE DIENE MONOMER MO-MASONRY OPENIN� TV-TELEVISION OR MONITOR <br /> EQ-EQUAL MTD-MOUNTED TYP-TYPICAL <br /> EQUIP-EQUIPMENT MTL- METAL <br /> SYMBOLS & w� <br /> EX/EXIST- EXISTING UL-UNDERWRITERSLABORATORY ABBREVIATIONS � <br /> EXH - EXHAUST N/A-NOT APPLICABLE UON-UNLESS OTHERWISE NOTED - <br /> NIC- NOT W CONTRACT UPS-UNINTERRUPTIBLE POWER SUPPLY E <br /> FA-FIRE ALARM NOM -NOMINAL UV-ULTRAVIOLET <br /> FACP- FIRE ALARM CONTROL PANEL NTS- NOT TO SCALE stams 9 <br /> F� - FLOOR DRAIN VAC-VACUUM PERMIT SET <br /> FDC- FIRE DEPARTMENT CONNECTION OA-OVERALL VCT-VINYL COMPOSITION TILE Drawn By KNRIKSR cnecked Qy: DD � <br /> FE- FIRE EXTINGUISHER O.C. -ON CENTER VERT-VERTICAL sca�e: 12"= 1'-0" Uafe: 05/15/2017 � <br /> FEC- FIRE EXTINGUISHER CABINET OD -OUTSIDE DIAMETER VEST-VESTIBULE Pro�e�t N�mber U <br /> FHC- FIRE HOSE CABINET OFCI -OWNER FURNISHEDICONTRACTOR INSTALLED VIF-CONTRACTOR TO VERIFY IN FIELD S EA'0OO4OA ° <br /> OF01 -OWNER FURNISHEDlOWNER INSTALLED " <br /> � <br /> Q <br /> FIN - FINISH OPP -OPPOSITE W-WEST Drawinq Number: Revision: <br /> FLR- FLOOR W/-WITH o <br /> FT-FOOT OR FEET W/0-WITHOUT <br /> FTG- FOOTING WC-WATER CLOSET O 1 0 0 O 0 0 <br /> FTR- FIN TUBE RADIATION WP -WORKING POINT <br /> FURN - FURNITURE of2oo a <br />