Laserfiche WebLink
INSPECTION REPORT <br /> Date����'�_ Permit: ���Q�� <br /> Contractor: �Gl,�� <br /> Owner: '�v�.��,�G-��� <br /> SiteAddress: °�ZZ � �QLC\� � <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑GroundworWSlab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Piumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains �uilding Final ❑Gas Pipe Finai ❑HWT Final <br /> OTHER OR CONSULTATION:��-2,""I'VI��Q___ ___ _____ <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PER <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION–24 hour notice required <br /> S <br /> rn 'D �C. � �� .� <br /> Inspector: Date: �� • <br /> EIR(10/06) DATABAR,INC. <br />