Laserfiche WebLink
Right of Way Procedures <br /> The CITY OF EVERETT,hereinafter referred to as "AGENCY", desiring to acquire real property(obtain an <br /> interest in, and possession of, real property) in accordance with the Uniform Relocation Assistance and Real <br /> Property Acquisition Policies Act and applicable federal regulations (49 CFR Part 24) and state law (Ch. 8.26 <br /> RCW), and state regulations (Ch.468-100 WAC) hereby adopts the following procedures to implement the <br /> above statutes and Washington Administrative Code.The AGENCY is responsible for the real property <br /> acquisition and relocation activities on projects administered by the AGENCY.To fulfill the above requirements <br /> the AGENCY will acquire right-of-way(ROW) in accordance with the policies set forth in the Right of Way <br /> Manual M 26-01 and Local Agency Guidelines.The AGENCY has the following expertise and personnel <br /> capabilities to accomplish these functions: <br /> 1. The following relate to the AGENCY's request. <br /> a. Below is a list of responsible AGENCY individual names and positions,for which the AGENCY has <br /> qualified staff to perform the specific right-of-way function(s). Attached are resumes for each <br /> individual AGENCY staff listed to perform those functions below, and a brief summary of their <br /> qualifications pertaining to the specific ROW function(s)for which they are listed. The procedures <br /> shall be updated whenever staffing changes occur.The AGENCY will be approved to acquire based <br /> upon staff qualifications. <br /> i. PROGRAM ADMINISTRATION : <br /> Oversee delivery of the R/W Program on federal aid projects for the agency. Ensures R/W <br /> functions are carried out in compliance with federal and state laws, regulations, policies and <br /> procedures. <br /> Responsibilities/Expectations: <br /> • Ensures agency's approved R/W Procedures are current,including staff qualifications,and <br /> provides copies to consultants and agency staff; <br /> • Oversight of ROW consultants; <br /> o use of consultant contract approved by WSDOT(under construction) <br /> o management of ROW contracts <br /> o management of ROW files <br /> o reviews and approves actions and decisions recommended by consultants <br /> o Overall responsibility for decisions that are outside the purview of consultant functions <br /> • Sets Just Compensation prior to offers being made; <br /> • Approves administrative offer summaries per policy; <br /> • Ensure agency has a relocation appeal process in place prior to starting relocation activities; <br /> • Oversight of Administrative Settlements; <br /> • Obligation authority for their agency; <br /> • Obtain permits(Non-Uniform Relocation Act(URA)); <br /> • Ensures there is a separation of functions to avoid conflicts of interest. <br /> • Verifies whether or not ROW is needed, and that the property rights and/or interests needed <br /> are sufficient to construct,operate and maintain the proposed projects(see Appendix 25.176). <br /> REAL PROPERTY MANAGER(Michael Palacios) <br /> (Insert Name and Title of AGENCY Position above&attach resume of qualifications) <br /> LPA-001 Right of Way Procedures Page 1 of 4 <br /> Revised 10/2016 SI""r.r*m TO RF,QUIREMENTS LISTFt) TN <br /> RIGiiNy .1 rauLEUURES Arr'RUVAL L::1TER <br />