Laserfiche WebLink
INSPECTION REPORT <br /> - Date_���� Permit: _v���,' �` w� __ <br /> Contractor: ___ ___ <br /> � <br /> ���� Owner: <br /> Site Address:_� � J� X� _ <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL LUMBIN � <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑GroundworklSlab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> �Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Fina� <br /> �lectrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION:_'C�S Z�-C.� �g�� __� <br /> APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PE MIT <br /> ❑ FOR T.C.O. ❑ CORRECTION REQUESTE� � <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: _ ____ ____ <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> �� <br /> � l <br /> 0/ /.�iJ / �� + <br /> ��—o.–,—, � <br /> Inspector: Date: �• <br /> EfR(10/06) DAT AR,INC. <br />