Laserfiche WebLink
� INSPECTION REPORT <br /> Date�Zh�� Permit: _ � � — �/�_ <br /> Contractor: ��`ZGlY,J'�- _ <br /> Owner: f�'�� <br /> Site Address: 1205 �/�a�%��-, lr�pl� �f�2(p <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medicai Gas <br /> ❑Ce�ling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ectrical Final ❑Shear Nailing GAS PIPE <br /> SI WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS P T <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: _ __ <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> ��_��,,,r� �a �_ <br /> Inspector: Date: � <br /> EIR(10/06) � � DATABAR,INC. <br />