My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 976-83
>
Ordinances
>
Ordinance 976-83
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/24/2018 11:53:00 AM
Creation date
4/24/2018 11:52:59 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
976-83
Date
9/21/1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> The City Clerk is hereby authorized and directed to deliver <br /> a certified copy of this ordinance to the Snohomish County <br /> Auditor. <br /> Section 6 . Expected Life of Facility. The Henry M. Jackson <br /> Center to be acquired, constructed and equipped from the proceeds <br /> of the Bonds is hereby estimated to have a useful life of not <br /> less than twenty years . <br /> Section 7 . Prior Acts. All acts taken pursuant to the <br /> authority of this ordinance but prior to its effective date, <br /> including the certification of the proposition by the City Clerk <br /> to the Snohomish County Auditor, are hereby ratified, approved <br /> and confirmed. <br /> PASSED by the City Council of the City of Everett, <br /> Washington, at a regular meeting thereof this ..V15-- - day of <br /> .SE-i�T�7�i.6E` , 1983 . <br /> •Mayor <br /> ATTEST: <br /> City Clerk <br /> Passed: ?-- ..?/- 17.3 <br /> Valid: 2.- .?/-42 <br /> Published: <br /> -5- WORK16 :EBR <br />
The URL can be used to link to this page
Your browser does not support the video tag.