Laserfiche WebLink
Work Activity Work Order Page 2 <br /> 4/s/aois io:ai <br /> ISSU@d By HLJ HUSBY,LANCE J. <br /> Issued Department Pw PUBLIC WORKS <br /> Date Issued 2rnno�s <br /> Fund ao� Account 5 Program Function Activity <br /> Program UT3473 14 3 <br /> TItl2 CONVERT.75 INCH 410 TAMARACK AVE UT3473-14-3 <br /> Work Order No 20180558 Project Activity Type CORRECTIVE MAINTENANCE StBtUS CL <br /> Status 2i2�i2o�s Time �s:2s Original WO Billing <br /> Problem Details <br /> CONVERT J5/NCH CURBSTOP TO.75 INCH SETTER WITH METER AND <br /> BOX. FLAT TO METER PROGRAM. <br /> Structure ID StrTyp Activitv Compl Date Comments <br /> WASRVC YES 2/27/2018 <br /> Address <br /> Cross Street <br /> Area Designator Structure Location <br /> Map Reference <br /> Location <br /> Material Costs Biuing <br /> Type Mater No Description Quantity Cost Date War <br /> M ADAP34000547 ADAPTER 3/4 MIP X 3/4 IPS INSTA-TITE 4 61.732 03/02/2018 PAP <br /> M BOX000154347 BOX METER MOLDED PLASTIC W/DI LID 11"X 18" (SMALL) 1 73.179 03/02/2018 PAP <br /> M ELL034104247 ELBOW 3/4 NPT 90 DEG STREET BRASS(1/4 BEND) 2 8.072 03/02/2018 PAP <br /> M METE34141847 METER 5/8 X 3/4 NEPTUNE W/E-CODER R9001 CU FT STUB ANTENNA 1 191.26 03/02/2018 PAP <br /> M PIPE34060647 PIPE 3/4 POLY IPS 200 PSI SIDR7 ASTM D2239 3 .951 03/02/2018 PAP <br /> M SETT34149747 SETTER COPPER 5/8 X 3/4 HEIGHT 7" NO LEG LENGTH VINO 1 102.43 03/02/2018 PAP <br /> Total Material Cost $437.62 <br /> NA Costs <br /> Type Na No Description Quantity Cost Billing Date War <br /> NA N/A 3/4 MINUS ROCK .25 5.77 03/02/2018 <br /> NA N/A TOPSOIL .13 3.279 03/02/2018 <br /> Total NA Cost $s.os <br /> Total Cost $�s.s� <br />