My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
308 73RD ST SW 2018-04-25
>
Address Records
>
73RD ST SW
>
308
>
308 73RD ST SW 2018-04-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2018 9:11:06 AM
Creation date
4/25/2018 9:11:05 AM
Metadata
Fields
Template:
Address Document
Street Name
73RD ST SW
Street Number
308
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT COMMENTS <br /> 4. Connect side sewer per City Standard#601. <br /> 5. Connect side sewer per City Standard#'s 601, 602, 604. <br /> 6. Connect all rooftop downspouts to the side sewer. <br /> 7. Connect rooftop downspouts to the drainage system provided for this lot. <br /> 8. Rooftop runoff must be discharged to a roof downspout infiltration system per City of Everett Storm <br /> Manual 3-2.6.2. The approximate size trench is 3.5' wide, 2' deep and 25' long. See attachment for <br /> more details. <br /> 9. The contractor must meet with the Public Works Inspector to discuss potential drainage routing prior to <br /> beginning the project. Call Randy Allen at 425-339-7403 //CaII Cliff Lindman at 425-339-7404. <br /> 10. Install erosion control measures as determined by the Public Works inspector, such as silt fence, straw <br /> bales, swale$, or erosion blankets. <br /> 11. Install erosion control measures per City of Everett Standards for small parcels <br /> 12. Remove erosion control measures upon completion of the project prior to final approval of the permit. <br /> �`�13. All excavated material from foundation, sidewalk and driveways shall be hauled to an approved, <br /> permitted site. No wasting of material is allowed on this building lot. <br /> 14. No dirt, mud, rocks or debris to be tracked onto roadway. <br /> 15. No building materials to be stacked on sidewalk/roadway and sidewalk/roadway to be kept clean and <br /> open for pedestrian travel. <br /> 16. Adjust water meter box 1"above sidewalk grade. <br /> 17. Remove and replace curb, gutter and sidewalk as per City of Everett Standard Plan#'s 305A& 306 on <br /> this proposal's frontage as directed by the Public Works Inspector(i.e. all unused driveways and any <br /> broken or damaged area must be replaced). <br /> 18. Install a Type l concrete driveway per City of Everett Standard#307. <br /> 19. Pave driveway from the front property line out to the street paving. <br /> 20. Pave to existing paving in alley. <br /> 21. Contact the Water District for connecting provisions for this 6uilding's water and <br /> sewer services. <br /> 22. A catch basin as per City Standard Plan #402 with a gas trap per Standard Plan#410 is required for the <br /> parking area. <br /> 23. If a sewer pump system is to be installed, the pressure line must discharge into a private manhole, then <br /> gravity flow across the public right-of-way. <br /> 24. A sprinkler system is required for this building in compliance with the requirements of NFPA Standards <br /> 13D. <br /> PWComments I Revised 6I8111 <br />
The URL can be used to link to this page
Your browser does not support the video tag.