My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
308 73RD ST SW 2018-04-25
>
Address Records
>
73RD ST SW
>
308
>
308 73RD ST SW 2018-04-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2018 9:11:06 AM
Creation date
4/25/2018 9:11:05 AM
Metadata
Fields
Template:
Address Document
Street Name
73RD ST SW
Street Number
308
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT oate: ��isi2o�� <br /> �y �,�. <br /> Public Works Permit#: PWW1111-001 <br /> zy� City of Everett Public Works Department guilding Permit#; <br /> 3200 Cedar Street <br /> ��� � � ��'� �� �� Everett, WA�98201 � <br /> (425)257-8810 Planning Reference#: <br /> Public Works Fee$: $ 25.00 <br /> Other $: <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> WHITE LESLIE L OWNER <br /> 308 73RD ST SW <br /> EVERETT WA 98203 <br /> PHONE: 4252102935 PHONE: <br /> TAX PARCEL ID# 00453200001400 91TE ADDRESS: 308 73RD ST SW <br /> DESCRIPTION OF PROPOSED WORK: <br /> REMOVE 10'OF DRIVEWAY <br /> & INSTALL CIRCULAR DRIVEWAY(REF CE11-0621) <br /> PERMIT CONDITIONS <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2_ All work shall be performed in accordance with the nermit and current City of Everett Design and Construction Standards <br /> -- ----- -- ------ - -- — - —_--------- — <br /> - -------- - - <br /> an peci ica ions. <br /> 3. Call Location Underground Service 48 hrs before you dig. TOLL FREE NUMBER 811 <br /> 4. Install erosion control measures as determined by the Public Works inspector, such as silt fence, straw bales, <br /> swales, or erosion blankets. CALL RANDY ALLEN AT 425-339-7403 w <br /> 5. Remove erosion control measures upon completion of the project prior to final approval of the permit. � <br /> 6. All excavated material from foundation, sidewalk and driveways shall be hauled to an approved, permitted site. � <br /> No wasting of material is allowed on this building lot. <br /> 7. No dirt, mud, rocks or debris to be tracked onto roadway. � <br /> 8. Pave driveway from the front property line out to the street paving. � <br /> � <br /> � <br /> 0 <br /> E"', <br /> � . <br /> O <br /> � <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and <br /> save harmless the City of Everett from any and all claims for <br /> damages, costs, expenses,or causes of action that may arise <br /> � r /�/ �� � because of installation and maintenance of the improvement <br /> ( �`�' or other right-of-way use hereto applied for and further agrees <br /> A roved for Construction D te to remove same upon notice from the City and to replace <br /> pp public property damaged thereby. <br /> FINAL INSPECTION Date <br /> Approved as Constructed Signature of Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WTTHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFfER IS TO BE DILIGENTLY <br /> PURSUED TO COMPLEfION. THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90 DAYS DURATION. <br />
The URL can be used to link to this page
Your browser does not support the video tag.