My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1122 75TH ST SW SNO CO PUD 2021-08-30
>
Address Records
>
75TH ST SW
>
1122
>
SNO CO PUD
>
1122 75TH ST SW SNO CO PUD 2021-08-30
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2021 2:53:29 PM
Creation date
4/25/2018 10:37:08 AM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SW
Street Number
1122
Tenant Name
SNO CO PUD
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
10/28/2019 Page 1 <br /> City of Everett <br /> 2:04:37PM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. E1807-126 Site Address 1122 75TH ST SW <br /> Applied 7/24/2018 Applicant Lot <br /> Approved 7/24/2018 Owner PUBLIC UTILITY DIST 1 SNO CO Block <br /> Issued 7/25/2018 Contractor DUTTON ELECTRIC CO Tract <br /> Parent Permit No. Description ELECTRICAL WORK AT THE BUSINESS CENTER,JOB 1814 <br /> Notes <br /> Scheduled Completed Tyne Inspector Result Remarks Inspector's Comments <br /> 9/13/2018 9/13/2018 ELEC 01-GROUND SKB APPROVAL As noted Groundwork OK from building B to hand <br /> WORK hole then to light pole through utility <br /> station. <br /> 9/18/2018 9/18/2018 ELEC 01-GROUND SKB PARTIAL APPR Ok electrical groundwork south gate raod <br /> WORK crossing. <br /> 9/19/2018 9/19/2018 ELEC 01-GROUND SKB PARTIAL APPR OK electrical groundwork from gate hard <br /> WORK hole to camera hand hole. <br /> 9/19/2018 9/19/2018 ELEC 03-ROUGH SKB PARTIAL APPR <br /> IN <br /> 9/21/2018 9/21/2018 ELEC 01-GROUND SKB APPROVAL As noted OK electcial ground work at front gate both <br /> WORK lane crossing and at 150 to the south for <br /> light poles. <br /> 9/26/2018 9/26/2018 ELEC 01-GROUND SKB APPROVAL As noted East driveway dith from south hand holes to <br /> WORK driveway crossing to CMU wall. <br /> 10/1/2018 10/1/2018 ELEC 01-GROUND SKB PARTIAL APPR From south hand <br /> WORK holes for cameras <br /> 10/3/2018 10/3/2018 ELEC 01-GROUND SKB PARTIAL APPR East side of north <br /> WORK gate OK <br /> 10/19/2018 10/19/2018 ELEC 01-GROUND SKB PARTIAL APPR OK on: <br /> WORK West side of frontentrance camera and light <br /> pole. <br /> Weat gate building to gate. <br /> Upper Parking lot new light pole. <br /> 10/29/2018 10/29/2018 ELEC 01-GROUND TRA APPROVAL See notes OK 6 light pole bases and camera pole <br /> WORK rough in. <br /> 11/14/2018 11/14/2018 ELEC 03-ROUGH TRA APPROVAL Exterior soffits OK <br /> IN <br /> 11/26/2018 11/26/2018 ELEC 09-FINAL TRA PARTIAL APPR Rooftop,gate panels,utility trailer panel. <br /> 12/5/2018 12/5/2018 ELEC 03-ROUGH SKB APPROVAL As noted Rough in for new fire alarm system OK. <br /> IN Old fire alarm to be removed when new <br /> system goes on line. <br /> 2/4/2019 2/4/2019 ELEC 09-FINAL SKB OTHER contractor cancelled Phone:425-330-3562 Mike <br /> insp.for snow <br /> 2/6/2019 2/6/2019 ELEC 09-FINAL MCB APPROVAL Phone:425-330-3562 Mike <br /> 2/7/2019 2/7/2019 ADMIN USE KLC APPROVAL <br /> ONLY** <br /> INSP12 CRIVs YS TEM <br />
The URL can be used to link to this page
Your browser does not support the video tag.