Laserfiche WebLink
10/28/2019 Page 1 <br /> City of Everett <br /> 2:04:37PM <br /> INSPECTION ACTIVITY REPORT <br /> Permit No. E1807-126 Site Address 1122 75TH ST SW <br /> Applied 7/24/2018 Applicant Lot <br /> Approved 7/24/2018 Owner PUBLIC UTILITY DIST 1 SNO CO Block <br /> Issued 7/25/2018 Contractor DUTTON ELECTRIC CO Tract <br /> Parent Permit No. Description ELECTRICAL WORK AT THE BUSINESS CENTER,JOB 1814 <br /> Notes <br /> Scheduled Completed Tyne Inspector Result Remarks Inspector's Comments <br /> 9/13/2018 9/13/2018 ELEC 01-GROUND SKB APPROVAL As noted Groundwork OK from building B to hand <br /> WORK hole then to light pole through utility <br /> station. <br /> 9/18/2018 9/18/2018 ELEC 01-GROUND SKB PARTIAL APPR Ok electrical groundwork south gate raod <br /> WORK crossing. <br /> 9/19/2018 9/19/2018 ELEC 01-GROUND SKB PARTIAL APPR OK electrical groundwork from gate hard <br /> WORK hole to camera hand hole. <br /> 9/19/2018 9/19/2018 ELEC 03-ROUGH SKB PARTIAL APPR <br /> IN <br /> 9/21/2018 9/21/2018 ELEC 01-GROUND SKB APPROVAL As noted OK electcial ground work at front gate both <br /> WORK lane crossing and at 150 to the south for <br /> light poles. <br /> 9/26/2018 9/26/2018 ELEC 01-GROUND SKB APPROVAL As noted East driveway dith from south hand holes to <br /> WORK driveway crossing to CMU wall. <br /> 10/1/2018 10/1/2018 ELEC 01-GROUND SKB PARTIAL APPR From south hand <br /> WORK holes for cameras <br /> 10/3/2018 10/3/2018 ELEC 01-GROUND SKB PARTIAL APPR East side of north <br /> WORK gate OK <br /> 10/19/2018 10/19/2018 ELEC 01-GROUND SKB PARTIAL APPR OK on: <br /> WORK West side of frontentrance camera and light <br /> pole. <br /> Weat gate building to gate. <br /> Upper Parking lot new light pole. <br /> 10/29/2018 10/29/2018 ELEC 01-GROUND TRA APPROVAL See notes OK 6 light pole bases and camera pole <br /> WORK rough in. <br /> 11/14/2018 11/14/2018 ELEC 03-ROUGH TRA APPROVAL Exterior soffits OK <br /> IN <br /> 11/26/2018 11/26/2018 ELEC 09-FINAL TRA PARTIAL APPR Rooftop,gate panels,utility trailer panel. <br /> 12/5/2018 12/5/2018 ELEC 03-ROUGH SKB APPROVAL As noted Rough in for new fire alarm system OK. <br /> IN Old fire alarm to be removed when new <br /> system goes on line. <br /> 2/4/2019 2/4/2019 ELEC 09-FINAL SKB OTHER contractor cancelled Phone:425-330-3562 Mike <br /> insp.for snow <br /> 2/6/2019 2/6/2019 ELEC 09-FINAL MCB APPROVAL Phone:425-330-3562 Mike <br /> 2/7/2019 2/7/2019 ADMIN USE KLC APPROVAL <br /> ONLY** <br /> INSP12 CRIVs YS TEM <br />