My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1313 75TH ST SW 2018-04-25
>
Address Records
>
75TH ST SW
>
1313
>
1313 75TH ST SW 2018-04-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/25/2018 10:43:37 AM
Creation date
4/25/2018 10:43:33 AM
Metadata
Fields
Template:
Address Document
Street Name
75TH ST SW
Street Number
1313
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
y 4 <br /> Public Notice <br /> I3osa-Grady, LLC, P.�. Box 15$, Mukilteo <br /> Washin�ton, 98201, is seeking coverage under <br /> the Washington Deparlment of �cology's <br /> NPD�S General Permit for Stormvvater <br /> Dischar�es Associated with Gonstruction <br /> Activities. The propased 9-acre project, <br /> known as 75'�' Street SW Pro�erty, is located <br /> on 75'"Sireet SW beiween 1G"Avenue W and <br /> Hardeson Road in Everett, Washington. <br /> Appxoximately 7.9 acres will be disturbed as <br /> site work is completed in preparation af future <br /> commercial/industrial construction along with <br /> construction of detention facilities and <br /> temporary gravel access road for detention <br /> facilities maintenance. Construction activities <br /> will include clearing and grading with <br /> approximately a net fill quantity of 130,000 <br /> cubic yards. No critical areas exist on-site or <br /> in the immeciiate vicinity. Silt laden runoff <br /> from construction activities wiil be contxoJled <br /> and �nitigated through the use of silt fencing, <br /> mulching, storm drain intet protection, and <br /> hydroseeding. Storn�water froin the site will <br /> be routed into interceptor swales with rock <br /> check dams to an an-site detention pond where <br /> it will be detained and treated, prior to <br /> discharge into the existing storm drain system. <br /> The outfal[ for the storm drain system into <br /> Merrill and Ring Creek is located <br /> appraximateIy 2Q00 feet downstream. Any <br /> persan desiri�3g to present their views to the <br /> Department of Ecology, ar interested an the <br /> department's aetion on this application may <br /> notify the Department of Ecology in writing <br /> within 30 days of the last date of publication <br /> of this notice. Comrnents can be submitted to: <br /> Department of Ecolagy, Water Quality <br /> Pro�,�ran�, Stormwater Unit - Construction, PO <br /> Box 4769b,Olympia, WA 98504-769b. <br /> Dates of publication in the �verett Herald: <br /> Apri124, a�id May I,2006, <br /> �`� <br /> .,,__ <br /> l � �� <br /> � � ,. <br /> � <br /> �_!. <br />
The URL can be used to link to this page
Your browser does not support the video tag.