My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reece Construction Company Inc 4/24/2018
>
Contracts
>
Capital Contract
>
Reece Construction Company Inc 4/24/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2019 10:44:28 AM
Creation date
4/26/2018 10:20:12 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reece Construction Company Inc
Approval Date
4/24/2018
Council Approval Date
3/28/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Improvement S
Public Works WO Number
UP3664
Tracking Number
0001163
Total Compensation
$1,866,805.49
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Reece Construction Co 9/12/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Reece Construction Company 8/29/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> 111 CITY OF EVERETT, WASHINGTON <br /> SPECIFICATIONS FOR <br /> WATER,MAIN REPLACEMENT "S" <br /> WO NO. - UP3664 <br /> NOTICE TO CONTRACTORS <br /> ADVERTISEMENT FOR BIDS <br /> Notice is hereby given that sealed bids for the WATER MAIN REPLACEMENT "S" will be received at the office <br /> of the City Clerk, 1st Floor Wall Street Building, 2930 Wetmore, Everett, Washington 98201, until 2:00 p.m. on <br /> Tuesday, March 6, 2018. At the appointed time, all bids will be opened and publicly read aloud in the 8th floor <br /> ' hearing room at the Wall Street Building. The engineer's estimate for this Project is $2,100,000. <br /> Work being performed includes, but is not limited to, furnishing all labor, materials and equipment necessary to <br /> construct approximately 3,660 linear feet of 12-in ductile iron earthquake resistant system and 1,960 linear feet <br /> of 8-inch ductile iron water main and other such appurtenances and performing all Work as required by the <br /> Contract, in accordance with the Contract Plans and Contract Provisions. <br /> Plans, Specifications, Addenda, and plan holders list for this Project may be viewed on line at <br /> https://everettwa.gov/319/Bid-Opportunities. <br /> Plan sets may also be purchased at Bill's Blueprints (425) 259-0859 at 2920 Rockefeller Avenue, Everett, WA <br /> 98201. <br /> For technical questions regarding this Project contact: Richard Hefti P.E., Project Manager, City of Everett, at <br /> (425) 257-7215. <br /> All bids must be made upon the regular forms provided for this purpose and must be accompanied by a bid <br /> bond or certified check in an amount not less than five percent(5%) of the total amount of the Bid. <br /> The City reserves the right to reject any and all bids and to waive any irregularities or informalities. No Bidder <br /> may withdraw his Bid after the hour set for the opening thereof. The City further reserves the right to make the <br /> bid award as deemed in the best interest of the City. The right is reserved by the City to postpone the award for <br /> a period of forty-five(45) days after bid opening. <br /> The Contractor will be required to comply with all local, State, and Federal laws and regulations pertaining to <br /> equal employment opportunities. <br /> By order of the City Council, Everett, Washington. <br /> Dated at Everett, Washington. <br /> SHARON FULLER, CITY CLERK <br /> 1111 I <br /> WATER MAIN REPLACEMENT"S" ADVERTISEMENT FOR BIDS January 29, 2018 <br /> WO No—UP3664 SP-1 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.