Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> Representative will promptly, by personal inspection, determine the actual status of the <br /> ' Work in accordance with the terms of the Contract. If the City's Representative finds <br /> materials, Equipment, or workmanship that do not meet the terms of the Contract, it <br /> will prepare a Punch List of such items and submit it to the Contractor. Following <br /> ' completion of the corrective work by the Contractor, the City's Representative will <br /> notify the City that the Work has been completed in accordance with the Contract. The <br /> City shall make the final determination of acceptability and completion. For portions of <br /> the Project not previously accepted as substantially complete, the conditions of <br /> ' guarantee shall commence on the date that the City determines the Project is <br /> complete. <br /> 1-08.6 Suspension of Work <br /> ' Supplement 1-08.6 by adding the following: <br /> 1-08.6(1) Suspension Procedures <br /> ' The City may, at its convenience and at any time and without cause, suspend all or <br /> any part of the Work by notice in writing to the Contractor. The Contractor shall <br /> resume the Work within five (5) calendar days after receiving written notice from the <br /> ' City to do so. The Contractor will be allowed an increase in the Contract Sum or an <br /> extension of Contract Time, or both, directly attributable to any suspension in <br /> accordance with the Change Order procedures in these Special Provisions; provided, <br /> ' the Contractor shall not be entitled to any increase to the extent caused by the <br /> Contractor. <br /> 1-08.7 Maintenance During Suspension <br /> Delete all of 1-08.7 and substitute the following: <br /> Before and during any suspension (as described in Section 1-08.6) the Contractor <br /> shall protect the Work from damage or deterioration. Suspension shall not relieve the <br /> ' Contractor from anything the Contract requires unless this Section states otherwise. <br /> At no expense to the City, the Contractor shall provide through the construction area a <br /> safe, smooth, and unobstructed roadway, sidewalk, and path for public use during <br /> ' suspension, as required in 1-07.23 PUBLIC CONVENIENCE AND SAFETY. This may <br /> require a temporary road or detour. <br /> If the Engineer determines that the Contractor failed to pursue the Work diligently <br /> ' before the suspension, or failed to comply with the Contract or orders, then the <br /> Contractor shall maintain the temporary roadway, sidewalk, and path in use during <br /> suspension. In this case, the Contractor shall bear the maintenance costs. If the <br /> ' Contractor fails to maintain the temporary roadway, sidewalk, and path the City will do <br /> the Work and deduct all resulting costs from payments due to the Contractor. <br /> If the Engineer determines that the Contractor has pursued the Work diligently before <br /> the suspension, then the City will maintain the temporary roadway, sidewalk, and path <br /> (and bear its cost). This City-provided maintenance work will include only routine <br /> maintenance of: <br /> 1. The Traveled Way, Auxiliary Lanes, Shoulders, detour surface, sidewalks, and <br /> ' paths, <br /> 2. Roadway drainage along and under the traveled Roadway, sidewalk, path or <br /> detour, and <br /> 3. All barricades, signs, and lights needed for directing traffic through the <br /> temporary Roadway, sidewalk, path or detour in the construction area. <br /> Water Main Replacement"S" Division 1 -GENERAL REQUIREMENTS January 29, 2018 <br /> WO No-UP3664 SP-99 <br />