Reece Construction Company Inc 4/24/2018
>
Contracts
>
Capital Contract
>
Reece Construction Company Inc 4/24/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2019 10:44:28 AM
Creation date
4/26/2018 10:20:12 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reece Construction Company Inc
Approval Date
4/24/2018
Council Approval Date
3/28/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Improvement S
Public Works WO Number
UP3664
Tracking Number
0001163
Total Compensation
$1,866,805.49
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Reece Construction Co 9/12/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Reece Construction Company 8/29/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> 1-08.10(12) Possession of Incomplete Portions of the Project <br /> (******) <br /> Should the Contractor fail to meet any date specified for Substantial Completion or <br /> Physical Completion of Work or any portion of Work requiring early possession and <br /> use by the City, the City may, after a 14 calendar day Notice to the Contractor, take <br /> over such portion or any Work that is behind schedule. In such case, the City's <br /> Representative will prepare a list of incomplete Work taken over by the City. The cost <br /> of City's work will be charged to and deducted from amounts due to the Contractor. <br /> The Substantial Completion date of the entire or a portion of the Project will be <br /> established as the date when the City actually begins using the Project or portion of <br /> the Project for its intended purpose. Division of responsibilities between City and <br /> Contractor, beginning of warranties, and any other issues relating to Substantial <br /> Completion shall be as specified in 1-08.5(2) SUBSTANTIAL COMPLETION. <br /> Supplement Section 1-08 by adding the following: <br /> 1-08.11 Record Drawings <br /> (******) <br /> 1-08.11(1) Description <br /> This section specifies the requirements for preparing record drawings. The Contractor, <br /> with the cooperation and assistance of the City Inspector, is responsible for marking up <br /> record drawings during the course of construction. The Contractor shall keep the <br /> record drawings up to date at all times during the course of construction. <br /> The Inspector will verify the record drawings are accurate and complete before <br /> accepting the Contractors monthly pay request. If the record drawings are not current <br /> or accurate, the pay request will not be processed. <br /> As the Contract approaches Final Acceptance, prepare, with the assistance of the <br /> Inspector, a complete and accurate set of record drawings. The Inspector must <br /> approve the record drawings prior to Final Acceptance. Final Acceptance will not be <br /> issued until the City accepts the record drawings. <br /> 1-08.11(2) Recording Changes <br /> As a minimum, record the following items on the record drawings: ' <br /> a. Actual dimensions, arrangement and materials used when different than <br /> shown on the Plans. <br /> b. Changes made by Change Order or Field Order. 1 <br /> c. Changes made by the Contractor. <br /> d. Horizontal and vertical locations of underground utilities and appurtenances, <br /> shall be referenced to monumentation. The monumentation shall be based <br /> on NAD 83-91 for Horizontal Datum and NAVD 88 for Vertical Datum. <br /> e. Any changes in centerline profile and curb &gutter (top of curb), offsets and <br /> elevations. <br /> f. Details, Equipment or materials used that were not shown on the original <br /> Plans. <br /> g. The actual arrangement and routing of conduit, embedded conduit, raceways <br /> and piping relative to its location and proportioned to other work. The location <br /> needs to be dimensioned on the record drawings. <br /> h. Contractor prepared piping schematics and diagram drawings representing <br /> the Equipment orientation. <br /> i. Final location of all surface and subsurface improvements. <br /> Water Main Replacement"S" Division 1 —GENERAL REQUIREMENTS January 29, 2018 <br /> WO No—UP3664 SP—104 <br />