My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reece Construction Company Inc 4/24/2018
>
Contracts
>
Capital Contract
>
Reece Construction Company Inc 4/24/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2019 10:44:28 AM
Creation date
4/26/2018 10:20:12 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reece Construction Company Inc
Approval Date
4/24/2018
Council Approval Date
3/28/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Improvement S
Public Works WO Number
UP3664
Tracking Number
0001163
Total Compensation
$1,866,805.49
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Reece Construction Co 9/12/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Reece Construction Company 8/29/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> Delete the fourth paragraph, beginning with "Contract Time", and the fifth paragraph, <br /> beginning with "Acceptable Materials", and substitute the following: <br /> Acceptable materials ordered by the Contractor prior to the date the Work was <br /> terminated or deleted will either be purchased from the Contractor by the City at the <br /> actual cost and shall become the property of the City, or the City will reimburse the <br /> Contractor for the actual costs of returning these materials to the suppliers. <br /> If Contractor disagrees with the adjustment of Contract Sum determined by the City's <br /> Representative, Contractor may submit a Contract Claim for the difference between <br /> the amount determined by the City's Representative and the amount sought by the <br /> Contractor. <br /> Contractor shall not be entitled to any anticipated profits on deleted, terminated, or <br /> uncompleted Work will be allowed. <br /> 1-09.6 Force Account <br /> Supplement 1-09.6 by adding the following: <br /> The City has estimated and included in the Proposal, dollar amounts for all items to be <br /> paid per Force Account, only to provide a common Bid for Bidders. All such dollar <br /> amounts are to become a part of Contractor's total bid. However, the City does not <br /> warrant expressly or by implication that the actual amount of Work will correspond with <br /> those estimates. Payment will be made on the basis of the amount of Work actually <br /> authorized by Engineer. <br /> 1-09.9 Payments <br /> Delete 1-09.9 and substitute the following: <br /> 1-09.9 Payments to Contractors <br /> (******) <br /> 1-09.9(1) Progress Payments <br /> Contractor shall submit progress payment estimate for completed Work and material I <br /> on hand based upon acceptable Work performed during the previous month, or since <br /> the last partial payment estimate was submitted. Submit progress payment estimate to <br /> City's Representative by the tenth day of each month, or by schedule mutually agreed <br /> upon in writing by the Contractor and City's Representative at the Pre-Construction <br /> Conference. Contractor shall make initial progress estimate not later than 30 days <br /> after the Work begins. Make successive progress estimates every month thereafter <br /> until the Completion Date. <br /> Progress estimates made during progress of the Work are tentative, and made only for <br /> the purpose of determining progress payment. The progress estimates are subject to <br /> change at any time prior to the calculation of the Final Payment. <br /> The value of the progress estimate will be the sum of the following: <br /> 1. Unit Price Items in the Proposal Form —the approximate quantity of <br /> acceptable units of work completed multiplied by the unit price. <br /> 2. Lump Sum Items in the Proposal Form —the estimated percentage complete <br /> multiplied by the Proposal Forms amount for each Lump Sum Item, or per the <br /> schedule of values for that item. <br /> 3. Materials on Hand — 100 percent of invoiced cost of material delivered to Job <br /> site or other storage area approved by the Engineer. <br /> 4. Change Orders— entitlement for approved extra cost or completed extra <br /> work as determined by the Engineer. <br /> Progress payments will be made in accordance with the progress estimate less: <br /> Water Main Replacement"S" Division 1 —GENERAL REQUIREMENTS January 29, 2018 <br /> WO No—UP3664 SP—108 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.