My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reece Construction Company Inc 4/24/2018
>
Contracts
>
Capital Contract
>
Reece Construction Company Inc 4/24/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2019 10:44:28 AM
Creation date
4/26/2018 10:20:12 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reece Construction Company Inc
Approval Date
4/24/2018
Council Approval Date
3/28/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Improvement S
Public Works WO Number
UP3664
Tracking Number
0001163
Total Compensation
$1,866,805.49
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Reece Construction Co 9/12/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Reece Construction Company 8/29/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> 1-09.11A(4) Extended or Unabsorbed Overhead <br /> 1-09.11A(4)A General <br /> To present a request for additional compensation for Extended or Unabsorbed <br /> Overhead, the Contractor has the burden of keeping and maintaining accurate <br /> documentation to support any such claim. If the Contractor fails to provide or <br /> keep inadequate financial data for an accurate and fair Eichleay calculation, <br /> Contractor waives and releases any claim for Unabsorbed or Extended Overhead. <br /> In presenting any claim under this section of the Contract, the Contractor agrees <br /> to provide to the City any and all financial data needed by the City, or its <br /> representative, to review, substantiate and evaluate any claim for Extended or <br /> Unabsorbed Home Office Overhead, or both. Failure to provide the requested <br /> information shall constitute waiver by the Contractor. <br /> If Contractor is entitled to an adjustment of Contract Sum for Unabsorbed or <br /> Extended Overhead, it shall be calculated as provided in these Special Provisions. <br /> 1-09.11A(4)A1 Elements <br /> Contractor shall only be entitled to an adjustment of Contract Sum for <br /> Unabsorbed or Extended Overhead if it clearly and convincingly <br /> demonstrates all of the following: <br /> 1. The City solely caused a Delay to the Completion Date as measured <br /> by analysis of the project duration by the critical path method <br /> pursuant to 1-08.3 PROGRESS SCHEDULE; <br /> 2. Because of the Delay described in subsection (A), the Contractor <br /> was forced to suspend or significantly interrupt its performance so <br /> that it was on standby or idled, and the City required the Contractor <br /> to be ready to resume performance on short notice. Extended time <br /> of performance of Work, such as extensions caused by changes, <br /> inefficiencies, or extra Work, does not constitute suspension or <br /> significant interruption of performance. <br /> 3. The Contractor could not and did not use resources, including, but <br /> not limited to, labor, equipment, materials and tools, standing by or <br /> idled on this or other project for any Work during the period of Delay; <br /> 4. The Contractor's Overhead costs did not materially vary from its <br /> usual seasonal Overhead costs during the period of Delay; and <br /> 5. The Delay did not cause over absorbed Overhead in the period the <br /> delayed Work was completed. <br /> 1-09.11 A(4)A1 a Resources <br /> To demonstrate the Contractor could not and did not use resources, <br /> including, but not limited to, labor, equipment, materials and tools from <br /> this Project for any other work on this or any other project during the <br /> period of Delay in accordance with item 3 of 1-09.11A(4)A1 of these <br /> Special Provisions, the Contractor shall: <br /> 1. Affirmatively represent and warrant that it did not perform <br /> substitute Work; <br /> 2. Identify the specific resources that were idled; and <br /> 3. Show that those resources did not, and could not, work on other <br /> contracts or projects during the Delay. <br /> Water Main Replacement"S" Division 1 -GENERAL REQUIREMENTS January 29, 2018 <br /> WO No-UP3664 SP-119 <br /> I <br />