Laserfiche WebLink
CITY OF EVERETT SPECIAL PROVISIONS <br /> I <br /> There will be no direct compensation made for haul on material moved within or from <br /> the Project site and the Contractor shall include the cost of hauling in his various unit <br /> contract prices. <br /> There will be no direct compensation made for "Proof Rolling" as required in this <br /> section for excavated portions of the roadway and the Contractor shall include costs in <br /> his various unit Contract prices. <br /> Payment for over excavation below subgrade and disposal of over excavated materials <br /> as required in this section shall be included in the Bid item for Foundation Material. <br /> Imported material required in this section shall be paid for by the unit Bid price for that <br /> material. Payment for placement and compaction of import material shall be included <br /> in the unit price per ton of import material. I <br /> 2-04 HAUL <br /> 2-04.1 Description <br /> Delete the first paragraph of 2-04.1 and substitute the following: <br /> This Work shall consist of transporting excavated material from its original site to its <br /> final place on the Project or to a Contractor arranged waste site. <br /> 2-04.3 Vacant <br /> Revise 2-04.3 to read as follows: <br /> 2-04.3 Construction Requirements , <br /> Off-highway earth-moving equipment shall not haul on or across streets, roadways, <br /> driveways, trails, sidewalks or parking lots not being improved in the Contract. <br /> 2-04.4 Measurement <br /> Revise 2-04.4 to read as follows: <br /> Haul work will not be measured. <br /> 2-04.5 Payment <br /> Revise 2-04.5 to read as follows: <br /> All costs for the Work described in Section 2-04 shall be included with excavation work <br /> with no direct compensation made. <br /> 2-07 WATERING <br /> 2-07.3 Construction Requirements <br /> Supplement 2-07.3 by adding the following: <br /> Only Everett Public Works Department Water Division personnel and the Project <br /> Inspector may authorize the operation of City fire hydrants or making connections to <br /> City water mains. Upon obtaining City permission, the following shall apply: <br /> 1. Use only those agency designated hydrants in strict accordance with City's <br /> requirements for hydrant use. Obtain a temporary hydrant permit from the <br /> City's Public Works Department Water Division. Temporary hydrant permits <br /> are available for a $1,200.00 deposit by contacting the City of Everett's Utility <br /> Billing at 425-257-8999 from 8:00 a.m. to 5:00 p.m. Monday through Friday. <br /> Deposit is refundable. Provide backflow prevention assembly approved by <br /> the City. <br /> 2. Secure permission from and comply with all requirements of the City's water <br /> utility before obtaining water from the fire hydrants. Notify the Engineer of <br /> City's permission as soon as granted. <br /> Water Main Improvement S Division 2-EARTHWORK January29, 2018 <br /> p <br /> WO No.-UP3664 SP-134 <br /> I <br />