My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reece Construction Company Inc 4/24/2018
>
Contracts
>
Capital Contract
>
Reece Construction Company Inc 4/24/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2019 10:44:28 AM
Creation date
4/26/2018 10:20:12 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reece Construction Company Inc
Approval Date
4/24/2018
Council Approval Date
3/28/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Improvement S
Public Works WO Number
UP3664
Tracking Number
0001163
Total Compensation
$1,866,805.49
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Reece Construction Co 9/12/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Reece Construction Company 8/29/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> DIVISION 7 — DRAINAGE STRUCTURES, STORM SEWERS, SANITARY SEWERS, <br /> WATER MAINS, AND CONDUITS <br /> 7-08 GENERAL PIPE INSTALLATION REQUIREMENTS <br /> 7-08.1 Description <br /> Further supplement 7-08.1 as follows: <br /> 7-08.1(1) Submittals <br /> Provide Type 2 Working Drawings for all materials and Standard Plans. <br /> Provide Type 3E Working Drawings for dewatering plans, if any. <br /> 1 7-08.2 Materials <br /> Delete material items listed in 7-08.2 and substitute the following: <br /> Provide materials meeting the following requirements: <br /> Foundation Material Class A or B 9-03.17 Standard Specifications <br /> Gravel Borrow 9-03.14(1) Standard Specifications <br /> Controlled Density Fill <br /> 2-09.3(1)E Special Provisions <br /> Crushed Surfacing Base Course 9-03.9(3) Standard Specifications <br /> 7-08.3 Construction Requirements <br /> 7-08.3(1) Excavation and Preparation of Trench <br /> 7-08.3(1)A Trenches <br /> Revise the second paragraph in 7-08.3(1)A and to read as follows: <br /> Excavate trench in accordance with COE Standard Drawing No 614. <br /> Delete the second sentence in the third paragraph in 7-08.3(1)A and substitute the <br /> ' following: <br /> Contractor may excavate above the top of the pipe zone only as wide as <br /> necessary to meet OSHA requirements. <br /> 7-08.3(1)C Bedding the Pipe <br /> Delete the second and third paragraphs in 7-08.3(1)C and substitute the following: <br /> Provide pipe zone bedding in accordance with COE Standard Drawing 614 <br /> I and 615. <br /> If the Engineer determines the material existing in the trench bottom is <br /> satisfactory for bedding the pipe, then the bedding material specified in the <br /> COE Standard Drawing 615 is not required, provided the existing material is <br /> loosened, regraded, and compacted to form a dense, unyielding base. <br /> Supplement 7-08.3(1) by adding the following: <br /> 7-08.3(1)D Trench Dewatering <br /> (******) <br /> This section specifies the definition, responsibilities and execution for dewatering <br /> associated with trench excavation for pipes, manholes, catch basins, cleanouts, <br /> side sewers and other buried utility work. Implement trench dewatering measures <br /> where necessary or directed by the Engineer. Implementation shall include, but <br /> not be limited to, the design, furnishing, installation, operation, maintenance, <br /> ' monitoring, reporting and removal of dewatering systems to achieve proper <br /> completion of Work performed under this Contract. <br /> Prevent the flow of surface water runoff into the trench excavation. Control <br /> surface water and other erosion control measures associated the Work in <br /> Water Main Replacement S Division 7—STORM,SEWER,WATER January 29, 2018 <br /> 1 WO No.—UP3664 SP—143 <br />
The URL can be used to link to this page
Your browser does not support the video tag.