I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> otherwise. If a Bid item for "Surveying" is not listed in the Proposal, then this <br /> ' item shall be included with the Work with no direct compensation made. <br /> Provide laser control equipment approved by the Engineer for setting pipe <br /> grades. <br /> ' 7-08.3(3) Backfilling <br /> Delete the first paragraph of 7-08.3(3) and substitute the following: <br /> Perform trench backfilling only after inspection and approval of the installed pipe <br /> bedding zone backfill. Refer to COE Standard Drawing No. 614, 615, 620 and the <br /> Plans for typical trench section backfill and compaction requirements. <br /> If the Engineer determines native material is not suitable for use as trench backfill, <br /> use "Gravel Borrow" conforming to 9-03.14(1) of the Standard Specifications. <br /> If there is an excess of suitable backfill material obtained from trench excavation <br /> at one location on the project, use it at other locations on the project or dispose of <br /> at an approved disposal site. The cost of transporting the excess backfill material <br /> is considered incidental to the Contract with no direct compensation made. <br /> Use Controlled Density Fill in lieu of select trench backfill for fill above pipe zone <br /> at street crossings and as directed by the Engineer in other areas where in order <br /> to prevent pavement patch settlement requires high density backfill placement or <br /> effective backfill compaction is not possible. <br /> Delete the first sentence of the third paragraph. <br /> Delete the third and fourth sentences of the fourth paragraph. <br /> 7-08.3(4) Plugging Existing Pipe <br /> Delete the first paragraph of 7-08.3(4) and substitute the following: <br /> Where shown on the plans to plug and seal existing water main, sanitary sewer <br /> and storm drainage pipe plug existing pipe a minimum distance of 2-feet from the <br /> inlet end with cement grout and abandon in place. <br /> 7-08.4 Measurement <br /> Delete all paragraphs in 7-08.4 and substitute the following: <br /> Bid items of Work completed pursuant to the Contract Documents will be measured as <br /> described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-08.5 Payment <br /> Delete all paragraphs in 7-08.5 and substitute the following: <br /> Payment for bid items of Work completed pursuant to the Contract Documents will be <br /> as described in Division B — Bid Item Descriptions of these Special Provisions and <br /> Section 1-09 MEASUREMENT AND PAYMENT of the Standard Specifications. <br /> 7-09 WATER MAINS <br /> 1 7-09.1 Description <br /> Revise the first paragraph in 7-09.1 to read as follows: <br /> ' This Work consists of constructing water mains in accordance with the Plans, the <br /> Standard Specifications, these Special Provisions and the COE Standard Drawings, at <br /> the location shown on the Plans. <br /> 7-09.1(1) Definitions <br /> 7-09.1(1)D Pipe Zone Backfill <br /> Revise the first paragraph in 7-09.1(1)D to read as follows: <br /> I <br /> Water Main Replacement S Division 7—STORM,SEWER,WATER January 29, 2018 <br /> WO No.—UP3664 SP—145 <br />