CITY OF EVERETT SPECIAL PROVISIONS <br /> Measurement and Payment: Unit Price per Ton (TON) <br /> Measurement for Foundation Material, Class A or B shall be by the ton, recorded on <br /> certified weight tickets in accordance with 1-09.2 WEIGHING EQUIPMENT, and placed <br /> within the limits of dimensions defined in the Work, descriptions for other bid items, shown <br /> on the Plans, or COE Standard Drawings, or as otherwise approved by the Engineer. <br /> The unit price bid per ton shall constitute full compensation for all labor, tools, materials and <br /> equipment required to furnish, place, and compact foundation material as specified in the <br /> Standard Specifications, these Special Provisions and as shown on COE Standard <br /> Drawing No. 610. <br /> The unit price for this bid item includes all costs for dewatering and over-excavation, <br /> removal, haul, and disposal of unsuitable subgrade material below the pipe zone or <br /> roadway subgrade. <br /> Bid Item 15 - Gravel Borrow <br /> Measurement and Payment: Unit Price per Ton (TON) <br /> Measurement for Gravel Borrow shall be by the ton, recorded on certified weight tickets in <br /> accordance with 1-09.2 WEIGHING EQUIPMENT, and placed within the limits of <br /> dimensions defined in the Work, descriptions for other bid items, shown on the Plans, or <br /> COE Standard Drawings, or as otherwise approved by the Engineer. <br /> ■ Measurement for gravel borrow shall be limited to maximum trench widths defined in the <br /> work descriptions for other bid items. <br /> The unit price per ton, based on certified weight tickets, for gravel borrow shall be full <br /> compensation for all labor, material, tools and equipment necessary to furnish imported <br /> gravel borrow for trench backfill where Engineer has determined native soils are not <br /> suitable for backfill, and other Work as required, from a Contractor-supplied source in <br /> accordance with 2-03.3(14)J of the Standard Specifications and these Special Provisions. <br /> The unit price for gravel borrow shall include all costs of furnishing, hauling, stockpiling, <br /> placing, grading and compacting the material in place. <br /> The unit price for this bid item includes all costs for removing, loading and disposing of <br /> displaced unsuitable material, including haul. <br /> Bid Item 16 - Ductile Iron Pipe For Water Main, 8-Inch Diam. <br /> Measurement and Payment: Unit Price per Linear Foot (LF) <br /> I Per linear foot pipe measurement shall be based on the slope distance from point to point. <br /> The point of beginning or ending of measurement in any particular run of pipe shall be the <br /> vertical intersection of the centerline of the pipe measured with the centerline of the <br /> intersection pipe, or with the beginning or ending of any new linear length of valves or <br /> couplings contained within the measured length. At changes in pipe size connected by a <br /> reducer, the point of measurement shall be taken as the midpoint of the reducer. <br /> The unit contract price for Ductile Iron Pipe For Water Main, =Inch Diam., shall constitute <br /> full compensation for all labor, materials, tools and equipment necessary to furnish and <br /> install the pipe, restrained joints (where shown on the Plans or as required by the Standard <br /> Specifications and Special Provisions), and all fittings, including tees, crosses, reducers, <br /> couplings, and sleeves required for complete installation along the run of each pipe size, as <br /> shown on the Plans and specified herein, and additionally, shall include, but not be limited <br /> to, the following: <br /> 1. Removal of structures or obstructions not specifically covered under other Bid Items. <br /> This shall include, but not be limited to, removal and disposal of the existing asphalt <br /> Water Main Replacement"S" Division B—BID DESCRIPTIONS January 29, 2018 <br /> WONo.—UP3664 SP-7 <br /> I <br />