My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reece Construction Company Inc 4/24/2018
>
Contracts
>
Capital Contract
>
Reece Construction Company Inc 4/24/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2019 10:44:28 AM
Creation date
4/26/2018 10:20:12 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reece Construction Company Inc
Approval Date
4/24/2018
Council Approval Date
3/28/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Improvement S
Public Works WO Number
UP3664
Tracking Number
0001163
Total Compensation
$1,866,805.49
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Reece Construction Co 9/12/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Reece Construction Company 8/29/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> above the top of the pipe in accordance with COE Standard Drawing No. 614. <br /> Standard excavating equipment shall be adjusted so as to excavate the narrowest <br /> trench possible. <br /> 7-09.3(7)A Dewatering of Trench <br /> Supplement 7-09.3(7)A by adding the following: <br /> Furnish, install, and operate necessary machinery, appliances, and <br /> equipment to keep excavations free from water during construction. <br /> ' Trench dewatering shall be included with the Work with no direct <br /> compensation made. <br /> 7-09.3(8) Removal and Replacement of Unsuitable Materials <br /> Delete all three paragraphs of 7-09.3(8) and substitute the following: <br /> Remove Engineer classified unsuitable material at the trench bottom and replace <br /> with "Foundation Material Class A or B", or other Engineer approved imported or <br /> native material. <br /> Replace, at Contractor's expense, unauthorized over-excavation with Gravel <br /> Borrow. Compact Gravel Borrow to minimum 90-percent maximum density. <br /> 17-09.3(9) Bedding the Pipe <br /> Revise the first paragraph in 7-09.3(9) to read as follows: <br /> Place sand backfill for pipe zone bedding to the depths shown in COE Standard <br /> Drawing No. 615. Compact sand backfill for pipe zone bedding around the pipe to <br /> 90-percent of maximum density by approved hand-held tools, so as to provide firm <br /> and uniform support for the full length of the pipe, valves, and fittings. Determine <br /> ' maximum in place density using nuclear method (ASTM 2922-17). Determine <br /> laboratory maximum dry density and optimum moisture content using the Modified <br /> Proctor Method in accordance with ASTM D-1557. Take care to prevent damage <br /> to the pipe and its protective coating. <br /> 7-09.3(10) Backfilling Trenches <br /> Revise the last paragraph in 7-09.3(10) to read as follows: <br /> ' Place a minimum 12-inch sand cushion between the water main and existing <br /> pipelines or other conduits when encountered during construction. <br /> Supplement 7-09.3(10) by adding the following: <br /> Backfill trenches in accordance with COE Standard Drawings No. 614, 615 and <br /> 620. <br /> Unless Engineer directs otherwise, provide Controlled Density Fill for fill above the <br /> pipe zone for water main construction that is perpendicular to the travel lane in <br /> paved street sections. <br /> The Engineer may authorize the use of Gravel Borrow or suitable native material <br /> ' in non-paved areas. <br /> 7-09.3(12) General Pipe Installation <br /> Supplement 7-09.3(12) by adding the following: <br /> ' Provide minimum two inch red wide locator tape with wording "Earthquake <br /> Resistant Pipeline Below" between 12 and 18 inches directly above the <br /> Earthquake System piping. <br /> ' 7-09.3(13) Handling of Pipe <br /> Supplement 7-09.3(13) by adding the following: <br /> Supply water main pipe having ends plugged by manufacturer immediately after <br /> manufacturing to eliminate debris entrance into the pipe during shipping and <br /> storage. Leave plugs in place until installing pipe in trench. Failure to supply the <br /> Water Main Replacement S Division 7—STORM, SEWER,WATER January 29, 2018 <br /> WO No.—UP3664 SP—147 <br />
The URL can be used to link to this page
Your browser does not support the video tag.