My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reece Construction Company Inc 4/24/2018
>
Contracts
>
Capital Contract
>
Reece Construction Company Inc 4/24/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2019 10:44:28 AM
Creation date
4/26/2018 10:20:12 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reece Construction Company Inc
Approval Date
4/24/2018
Council Approval Date
3/28/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Improvement S
Public Works WO Number
UP3664
Tracking Number
0001163
Total Compensation
$1,866,805.49
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Reece Construction Co 9/12/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Reece Construction Company 8/29/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> Provide mechanical restrainingdevices inplace of concrete blockingon all <br /> joint <br /> fittings connecting ductile iron pipe to ductile iron pipe. <br /> Where shown on the Plans or as allowed by the Engineer, provide concrete thrust <br /> blocking at bends, tees, plugs and crosses, including City installed fittings. <br /> Provide cast-in-place concrete thrust blocking having a minimum of 1/4-square <br /> foot bearing against the fitting and two square feet bearing against undisturbed <br /> soil and be clear of joints so as to permit taking up or dismantling joint. Provide a <br /> minimum measurement of 12-inches between the pipe and the undisturbed bank <br /> for all poured in place concrete thrust blocking. Form concrete blocking and pour <br /> using commercial concrete. Place blocking between solid ground and the fitting to <br /> be anchored with the area bearing on the pipe and on the ground in each instance <br /> being as Shown or directed by the Engineer. Place the blocking, unless otherwise <br /> shown or directed, so that the pipe and fitting joints, including nuts and bolts, can <br /> be accessible for repair. <br /> ' 7-09.3(23) Hydrostatic Pressure Test <br /> Supplement 7-09.3(23) by adding the following: <br /> Provide City approved double-check assembly for the purpose of testing and <br /> ' flushing. City will not charge for the water used in this operation. <br /> Successfully complete hydrostatic pressure test prior to starting disinfecting new <br /> water mains. <br /> ' 7-09.3(23)A Testing Extensions from Existing Mains <br /> Delete 7-09.3(23)A. <br /> 7-09.3(24) Disinfection of Water Mains <br /> Delete 7-09.3(24), including subsections, and substitute the following: <br /> 7-09.3(24) Flushing and Disinfection of Water Mains <br /> (******) <br /> Flush, disinfect with a chlorine solution and obtain passing coliform bacteria test <br /> reports before placing new water mains or extensions to existing mains in service. <br /> Submit flushing and disinfection procedures in accordance with this section. Provide <br /> submittal containing, at a minimum: <br /> • location of taps and other appurtenances used for chlorination and flushing <br /> purposes, <br /> • location of the sample collection taps, <br /> • disposal location and treatment procedure for chlorinated water discharged <br /> from the mains, and <br /> • procedure for disinfection including application method, point of application, <br /> and target concentrations for the contact interval being used. <br /> 7-09.3(24)A Flushing <br /> ' Flush sections of pipe being disinfected to remove solids that may have become <br /> lodged in the pipe. Provide a tap sufficient to provide a flush velocity inside the <br /> main of at least 2.5 fps if no hydrant is installed at the end of the main. Flush as <br /> long as material or color is visible in the discharge. Flush at a minimum one full <br /> pipe volume of water from the section of new main being tested. <br /> Guidelines for Required Flow and Openings to Flush Pipelines <br /> (assumes 40 psi residual pressure in water main) <br /> ' Pipe Dia. Flow Required Size of Tap (in) Number of <br /> (in.) to Produce 2.5 2 1/2" Hydrant <br /> fps (approx) outlets <br /> Velocity in Main 1 1 1/2 2 <br /> (gpm) (in) (in) (in) <br /> Water Main Replacement S Division 7-STORM,SEWER,WATER January 29, 2018 <br /> WO No.-UP3664 SP-149 <br />
The URL can be used to link to this page
Your browser does not support the video tag.