My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reece Construction Company Inc 4/24/2018
>
Contracts
>
Capital Contract
>
Reece Construction Company Inc 4/24/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2019 10:44:28 AM
Creation date
4/26/2018 10:20:12 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reece Construction Company Inc
Approval Date
4/24/2018
Council Approval Date
3/28/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Improvement S
Public Works WO Number
UP3664
Tracking Number
0001163
Total Compensation
$1,866,805.49
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Reece Construction Co 9/12/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Reece Construction Company 8/29/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> 9-29.3 Fiber Optic Cable, Electrical Conductors, and Cable <br /> 9-29.3(2) Electrical Conductors and Cable <br /> Revise 9-29.3(2)F to read as follows: <br /> 9-29.3(2)F Detector Loop Wire <br /> Provide 14 AWG stranded copper conductors conforming to IMSA Specification I <br /> 61-7 with cross-linked polyethylene (XLPE) insulation encased in a polyethylene <br /> outer jacket (PE tube). <br /> Supplement 9-29.3(2) by adding the following: 1 <br /> 9-29.3(2)J Video Detection Cable <br /> Coaxial cable or combination (composite/Siamese) cable for video detection shall <br /> be RG59/U with a manufacturer's rating of 600 Volts (Non UL - manufacturer's1 <br /> voltage rating of the insulation is acceptable). Combination cable shall be in <br /> accordance with the video detection system manufacturer's recommendations for <br /> the length of cable required. <br /> 9-29.18 Vehicle Detector <br /> Supplement 9-29.18 by adding the following: <br /> All components needed to provide a complete video detection system shall be supplied I <br /> and installed per manufacturer's recommendation. <br /> The video detection equipment shall include, but not be limited to, Cameras, Camera <br /> Housings, Camera Lens, Camera Mounting Hardware, Video Image Processors, Input <br /> File Adapters, lens Adjustment Modules, Keypad and Monitor. <br /> The video detection system shall be capable of supplying video detection to the signal <br /> controller phases as indicated in the plans and Appendix H of these Special <br /> Provisions. <br /> The video detection system shall be the following: <br /> 1. Traficon VIP3.2 I <br /> Traficon NV <br /> Bissegemsestraat 45 <br /> B-8501 Heule <br /> Belgium, Europe <br /> 9-30 WATER DISTRIBUTION MATERIALS <br /> 9-30.1 Pipe 1 <br /> 9-30.1(1) Ductile Iron Pipe <br /> Revise 9-30.1 to read as follows: <br /> 1. Provide ductile iron pipe Special Class 52 meeting the requirements of AWWA <br /> C151 with a cement mortar interior lining and a 1-mil thick exterior seal coat <br /> meeting the requirements of AWWA C104. <br /> 2. Provide rubber gasket type, push on type, or mechanical type non-restrained <br /> joints meeting the requirements of AWWA C111. <br /> 3. Provide flanged joints meeting the requirements of AWWA C115. <br /> 4. Restrained joints shall be as specified in Section 9-30.2(6). 1 <br /> Revise 9-30.2(2) to read as follows: <br /> 9-30.1(2) Polyethylene Encasement <br /> 9-30.1(2)A For Non-Earthquake Resistant Pipe <br /> Provide natural or black color polyethylene encasement in tube-form high-density <br /> cross-laminated polyethylene film or linear low-density polyethylene film meeting <br /> the requirements of ANSI/AWWA C105. <br /> Water Main Improvement S Division 9—MATERIALS January 29, 2018 <br /> WO No.—UP3664 SP—174 I <br />
The URL can be used to link to this page
Your browser does not support the video tag.