My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reece Construction Company Inc 4/24/2018
>
Contracts
>
Capital Contract
>
Reece Construction Company Inc 4/24/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2019 10:44:28 AM
Creation date
4/26/2018 10:20:12 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reece Construction Company Inc
Approval Date
4/24/2018
Council Approval Date
3/28/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Improvement S
Public Works WO Number
UP3664
Tracking Number
0001163
Total Compensation
$1,866,805.49
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Reece Construction Co 9/12/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Reece Construction Company 8/29/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> `��� associated Exploration Log <br /> earth sciences Project Number Exploration Number Sheet <br /> Incorporated 170432E001 EB-1 1of1 <br /> Project Name Water Main Replacement'S' Ground Surface Elevation(ft) 200 <br /> I Location Everett.WA Datum NAVfI 88 <br /> Driller/Equipment Boretec/Track Date Start/Finish 9113/17 9/1311,7 <br /> Hammer Weight/Drop 140#/30" Hole Diameter(in) A inrhAR <br /> V N U Q O > M <br /> R. '..E q. �, °+N Blows/Foot co <br /> p T g C7f �o IR a>m <br /> 1— <br /> 'a <br /> DESCRIPTION 10 20 30 40 ° <br /> I Asphalt-6 inches(2 Layers) <br /> Fill <br /> I _ Moist,dark brown to tan,fine to coarse SAND,some silt,some gravel, <br /> S-1 :. : contains charcoal,wood debris,and other organics(SM). 1 ♦9 <br /> 8 <br /> II5As above;biowcounts overstated due to rock. <br /> S-2 • <br /> • 19 <br /> 29 <br /> 1 21 A50 <br /> • Vashon Advance Outwash <br /> I — 10 <br /> Wet,grayish brown,silty,fine to coarse SAND,some gravel;stratified <br /> S-3 • • (SM). 33 A71. <br /> I y • • _ <br /> Bottom of exploration boring at 11.5 feet 38 <br /> — 15 <br /> I <br /> -- 20 <br /> I <br /> — 25 <br /> i 1;--_ <br /> N- <br /> cdN <br /> m- <br /> a <br /> ) <br /> m <br /> a <br /> N Sampler Type(ST): <br /> EL 2"OD Split Spoon Sampler(SPT) 0 No Recovery <br /> 1M-Moisture <br /> Si. ogged by: DV <br /> o 3"OD Split Spoon Sampler(D&M) Ring Sample . Water Level() Approved by: CJK <br /> LT ® Grab Sample Q Shelby Tube Sample T. Water Level at time of drilling(ATD) <br /> Water Main Replacement"S" Boring Logs-Appendix A January 29, 2018 <br /> UP3664 SP-181 <br />
The URL can be used to link to this page
Your browser does not support the video tag.