My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reece Construction Company Inc 4/24/2018
>
Contracts
>
Capital Contract
>
Reece Construction Company Inc 4/24/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2019 10:44:28 AM
Creation date
4/26/2018 10:20:12 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reece Construction Company Inc
Approval Date
4/24/2018
Council Approval Date
3/28/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Improvement S
Public Works WO Number
UP3664
Tracking Number
0001163
Total Compensation
$1,866,805.49
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Reece Construction Co 9/12/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Reece Construction Company 8/29/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> DIVISION P-PROPOSAL <br /> I CITY OF EVERETT, WASHINGTON <br /> WATER MAIN REPLACEMENT S <br /> WORK ORDER#UP3664 <br /> To the City Council <br /> Everett, Washington <br /> 1 <br /> The undersigned Bidder declares that he has carefully examined the Plans and Specifications,Notice to <br /> Contractors, Standard Specifications, Special Provisions, Appendix, Proposal, and Contract for the <br /> construction of approximately 3,660 linear feet of 12-inch earthquake resistant ductile iron <br /> watermain system, 1,960 linear feet of 8-inch ductile iron watermain and other such Work as may <br /> be necessary, in accordance with the Specifications, as shown on the Plans. The undersigned declares <br /> that he has made such investigations as are necessary to determine the conditions to be encountered, <br /> and that, if this Proposal is accepted, he will enter into a contract with the City of Everett, Washington, <br /> in the form of Contract hereto annexed, he will, to the extent required, provide the necessary <br /> equipment, tools, apparatus, and other means of construction, and he will furnish all labor and <br /> materials necessary to complete the Work in the manner herein specified and according to the <br /> requirements of the Engineer. <br /> The undersigned Bidder certifies that this Proposal is in all respects fair and is made without collusion <br /> on the part of any person, firm or corporation mentioned below, and no officer or employee of the City <br /> of Everett is personally or financially interested, directly or indirectly, in the Proposal or in any <br /> purchase of or sale of any materials or supplies for the Work to which it relates, or any portion of the <br /> profits thereof. <br /> The undersigned Bidder agrees that he will complete the Work in all respects as required by Division <br /> C, Article 2. Time for Completion and that he will pay liquidated damages to the City in the amount <br /> specified in the Contract. <br /> Accompanying this Proposal is a bid bond or certified check in the amount of five percent (5%) of the <br /> Proposal according to the conditions of the "Notice to Contractors" and "Division 1 - General <br /> Requirements" hereby attached. If this Proposal shall be accepted by the City of Everett, Washington, <br /> ' and the undersigned shall fail to execute a satisfactory contract and bond, as stated in the Division 1 — <br /> General Requirements hereto attached, within 14 calendar days after the Award Date, then the City <br /> may, at its option, determine that the undersigned has abandoned the Contract and thereupon this <br /> Contract shall be null and void and the amount of the bid bond or certified check accompanying this <br /> Proposal shall be forfeited and become the property of the City of Everett, Washington. <br /> I <br /> I <br /> I <br /> iWater Main Replacement S Division P—PROPOSAL January 29, 2018 <br /> Work Order No.—UP3664 SP—17 <br /> r <br />
The URL can be used to link to this page
Your browser does not support the video tag.