I <br /> 111 CITY OF EVERETT,WASHINGTON <br /> ICONTRACT <br /> THIS CONTRACT is made and entered into this A 1;n day of (YlARC 1\ , 2018, by and between <br /> the City of Everett, Washington, a municipal corporation existing under the laws of the State of <br /> I Washington hereinafter called the "City," and <br /> Washington, <br /> Co1JSTEtVGur.) L"omPAo'-k a <br /> W C' Ia ANG-ro N (o(L'ma<to,J , hereinafter called the "Contractor." <br /> IIn consideration of the sums to be paid to it by the City, Contractor hereby covenants and agrees to <br /> furnish all labor, tools, materials, equipment, and supplies required to build and construct and to build <br /> and construct in a workmanlike manner the work, improvements, and appurtenances in accordance with <br /> 1 the Specifications and Plans entitled: WATER MAIN REPLACEMENT"S"—UP3664 (the"Project"). <br /> 1. Contract Documents. The following documents ("Contract Documents") are incorporated by <br /> Ireference and are hereby made a part of this Contract: <br /> A. Notice to Contractors <br /> I B. Instructions to Bidders (if any) <br /> C. Washington State Department of Transportation Standard Specifications 2016 as <br /> modified by all amendments thereto as of the date of bid opening of this Project <br /> I ("Standard Specifications"). <br /> D. Special Provisions <br /> E. Plans, Drawings and Project Specifications <br /> F. Addenda(if any) <br /> G. Payment Bond and Performance Bond <br /> IH. Contractor's Proposal/Bid(conformed copy dated 3) )act)% ) <br /> I. All provisions required by law whether set forth and reproduced herein or not <br /> I 2. Time for Completion. Substantial completion shall be achieved within 100 working days of the <br /> effective date of the Notice to Proceed. Physical completion shall be within 20 working days of the <br /> actual date of issuance of substantial completion. <br /> 1 3. Liquidated Damages. The parties agree the City will suffer damage and be put to additional <br /> expense in the event that the Contractor does not complete the work in all respects and have it ready for <br /> use by the substantial completion date stated. Because it is difficult to accurately compute the amount of <br /> I such costs and damages, the Contractor hereby covenants and agrees to pay to the City liquidated <br /> damages as computed in Section 1-08.9 of the Standard Specifications, for each and every working day <br /> required to accomplish substantial completion of the work in excess of the period established above for <br /> I substantial completion. For overruns in contract time occurring after the physical completion date, <br /> liquidated damages shall be assessed at the rate of ten percent (10%) of the amount computed in Section <br /> 1-08.9 of the Standard Specifications until the work is physically complete. <br /> I 4. Contract Amount. The amount of this Contract is O S� 6 805. i-t 9 <br /> ($ ) and is based on the proposal/bid submitted by Contractor dated <br /> 3 -06_ J18 . The basis for final payment will be the actual amount of work performed <br /> I <br /> according to the Contract Documents and payments, whether partial or final, shall be made as specified <br /> therein. <br /> 5. Withholding. Five percent (5%) of amounts due Contractor shall be retained and withheld to ensure <br /> Ithe timely and faithful completion of the work and to comply with RCW Chap. 60.28. Releases of <br /> WATER MAIN REPLACEMENT"S" Division C -CONTRACT January 29, 2018 <br /> IWork Order#UP3664 SP-29 <br />