My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reece Construction Company Inc 4/24/2018
>
Contracts
>
Capital Contract
>
Reece Construction Company Inc 4/24/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2019 10:44:28 AM
Creation date
4/26/2018 10:20:12 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reece Construction Company Inc
Approval Date
4/24/2018
Council Approval Date
3/28/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Improvement S
Public Works WO Number
UP3664
Tracking Number
0001163
Total Compensation
$1,866,805.49
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Reece Construction Co 9/12/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Reece Construction Company 8/29/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT SPECIAL PROVISIONS <br /> 1-02.9 Delivery of Proposal <br /> Delete all of 1-02.9 and substitute the following: ' <br /> Bidder shall submit Bidder's Proposal in a sealed opaque envelope that clearly and <br /> legibly notes the Project Name, the time and date of the bid opening, and the Bidder's <br /> name and address on the outside of the envelope. <br /> The City will not open or consider any Proposal or any supplement to a Proposal that <br /> is received after the time specified for receipt of Proposals, or received in a location <br /> other than that specified for receipt of Proposals. <br /> 1-02.10 Withdrawaling, Revising, or Supplementing Proposal <br /> Delete 1-02.10 and substitute with the following: <br /> After submitting a physical Bid Proposal to the City, the Bidder may withdraw, revise, or <br /> supplement it if: <br /> 1. The Bidder submits a written request signed by an authorized person, and <br /> 2. The City receives the request before the time set for receipt of Proposals. <br /> The original physical Bid Proposal may be supplemented, or revised and resubmitted <br /> as the official Bid Proposal if the City receives it before the time set for receipt of <br /> Proposals. Email, fax or telephone requests to withdraw, revise, or supplement a <br /> Proposal are not acceptable. <br /> Resubmitted Proposals shall be in full compliance with the bidding requirements. Bid <br /> deposit shall be in an amount sufficient for the Proposal as resubmitted. <br /> After the scheduled time for opening Proposals, no Bidder will be permitted to withdraw <br /> his Proposal unless the award of contract is delayed for a period exceeding 45 <br /> calendar days. Proposals received after the scheduled closing for opening Proposals <br /> will be returned unopened to the Bidder. <br /> 1-02.12 Public Opening of Proposals <br /> Supplement 1-02.12 by adding the following: <br /> 1-02.12(1) Postponement of Opening <br /> (******) <br /> The City reserves the right to postpone the date and time for receiving or opening of <br /> Bids, or both, at any time prior to the date and time established in the Notice to <br /> Bidders. Postponement notices shall be provided to Bidders in the form of addenda. <br /> 1-02.13 Irregular Proposals <br /> Revise item 1 of 1-02.13 to read as follows: <br /> 1. A Proposal will be considered irregular and will be rejected if: <br /> a. The Bidder is not prequalified when so required; <br /> b. The authorized proposal form furnished by the City is not used or is altered; <br /> c. The completed proposal form contains any unauthorized additions, deletions, <br /> alternate Bids, or conditions; <br /> d. The Bidder adds provisions reserving the right to reject or accept the Award, <br /> or enter into the Contract; <br /> e. A price per unit cannot be determined from the Bid Proposal; <br /> f. The Proposal form is not properly executed; <br /> g. The Bidder fails to submit or properly complete a Subcontractor list, if ' <br /> applicable, as required in 1-02.6; <br /> Water Main Replacement"S" Division 1 —GENERAL REQUIREMENTS January 29, 2018 <br /> WO No—UP3664 SP—46 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.