My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reece Construction Company Inc 4/24/2018
>
Contracts
>
Capital Contract
>
Reece Construction Company Inc 4/24/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2019 10:44:28 AM
Creation date
4/26/2018 10:20:12 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reece Construction Company Inc
Approval Date
4/24/2018
Council Approval Date
3/28/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Improvement S
Public Works WO Number
UP3664
Tracking Number
0001163
Total Compensation
$1,866,805.49
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Reece Construction Co 9/12/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Reece Construction Company 8/29/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> I <br /> 2-07.5 Payment 135 <br /> I 2-09 STRUCTURE EXCAVATION 135 <br /> 2-09.2 Materials 135 <br /> 2-09.3 Construction Requirements 135 <br /> I 2-09.4 Measurement 136 <br /> 2-09.5 Payment 136 <br /> 2-11 TRIMMING AND CLEANUP 136 <br /> I 2-11.3 Construction Requirements 136 <br /> 2-11.4 Vacant 137 <br /> 2-11.4 Measurement 137 <br /> I2-11.5 Payment 137 <br /> DIVISION 5 - SURFACE TREATMENTS AND PAVEMENTS 139 <br /> 5-06 PAVEMENT PATCHING (******) 139 <br /> I5-06.1 Description 139 <br /> 5-06.2 Materials 139 <br /> 111 5-06.3 Construction Requirements 139 <br /> 5-06.4 Measurement 141 <br /> 5-06.5 Payment. 141 <br /> I DIVISION 7 - DRAINAGE STRUCTURES, STORM SEWERS, SANITARY SEWERS, WATER <br /> MAINS, AND CONDUITS 143 <br /> 7-08 GENERAL PIPE INSTALLATION REQUIREMENTS 143 <br /> I 7-08.1 Description 143 <br /> 7-08.2 Materials 143 <br /> 7-08.3 Construction Requirements 143 <br /> I 7-08.4 Measurement 145 <br /> 7-08.5 Payment 145 <br /> 7-09 WATER MAINS 145 <br /> I7-09.1 Description 145 <br /> 7-09.2 Materials 146 <br /> 7-09.3 Construction Requirements 146 <br /> I7-09.4 Measurement 152 <br /> 7-09.5 Payment 152 <br /> 7-12 VALVES FOR WATER MAINS 152 <br /> I7-12.1 Description 152 <br /> 7-12.2 Materials 153 <br /> I 7-12.3 Construction Requirements 153 <br /> 7-12.4 Measurement 154 <br /> 7-12.5 Payment 154 <br /> I 7-14 HYDRANTS 154 <br /> 7-14.1 Description 154 <br /> 7-14.2 Materials 154 <br /> I 7-14.3 Construction Requirements 154 <br /> 7-14.4 Measurement 155 <br /> Watermain Replacement"S" Table of Contents - January 29, 2018 <br /> IWO No.-UP3664 SP-v <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.