My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reece Construction Company Inc 4/24/2018
>
Contracts
>
Capital Contract
>
Reece Construction Company Inc 4/24/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2019 10:44:28 AM
Creation date
4/26/2018 10:20:12 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reece Construction Company Inc
Approval Date
4/24/2018
Council Approval Date
3/28/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Improvement S
Public Works WO Number
UP3664
Tracking Number
0001163
Total Compensation
$1,866,805.49
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Reece Construction Co 9/12/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Reece Construction Company 8/29/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> unit or lump sum price is less than the minimum specified amount, the City will <br /> unilaterally revise the unit or lump sum price, to the minimum specified amount and <br /> recalculate the extension. The total of extensions, corrected where necessary, <br /> including sales taxes where applicable and such additives and alternates as selected <br /> by the City, will be used by the City for Award purposes and to fix the awarded Contract <br /> Sum and the amount of the Contract Bond(s). <br /> Revise the third and fourth paragraphs of 1-03.1 to read as follows: <br /> Within 5 days after the opening of Proposals, a Bidder who wishes to claim error shall <br /> submit a notarized affidavit signed by the Bidder, accompanied by original work sheets <br /> used in the preparation of the Proposal, requesting relief from the responsibilities of <br /> Award. The affidavit shall describe the specific error(s) and certify that the work sheets <br /> are the originals used in the preparation of the Proposal. The Engineer will review the <br /> certified work sheets to determine the validity of the claimed error and make <br /> recommendation to the City. If the City concurs in the claim of error, the Bidder will be <br /> relieved of responsibility, and the bid deposit of the Bidder will be returned. Thereafter, <br /> at the discretion of the City, all Bids may be rejected or Award made to next lowest and <br /> responsive Bidder. <br /> 1-03.1(1) Identical Bid Totals <br /> (January 4, 2016 APWA GSP) <br /> Revise to read as follows: <br /> After opening Bids, if two or more lowest responsive Bid totals are exactly equal, I <br /> then the tie-breaker will be the Bidder with an equal lowest bid, which proposed to <br /> use the highest percentage of recycled materials in the Project, per the form <br /> submitted with the Bid Proposal. If those percentages are also exactly equal, then <br /> the tie-breaker will be determined by drawing as follows: Two or more slips of <br /> paper will be marked as follows: one marked "Winner" and the other(s) marked <br /> "unsuccessful". The slips will be folded to make the marking unseen. The slips will <br /> be placed inside a box. One authorized representative of each Bidder shall draw a <br /> slip from the box. Bidders shall draw in alphabetic order by the name of the firm as <br /> registered with the Washington State Department of Licensing. The slips shall be <br /> unfolded and the firm with the slip marked "Winner" will be determined to be the <br /> successful Bidder and eligible for Award of the Contract. Only those Bidders who <br /> submitted a Bid total that is exactly equal to the lowest responsive Bid, and with a <br /> proposed recycled materials percentage that is exactly equal to the highest <br /> proposed recycled materials amount, are eligible to draw. <br /> Supplement 1-03.1 by adding the following: <br /> 1-03.1(2) Preference for Resident Contractors <br /> In accordance with RCW 39.04.380, if a Bid is received from a nonresident contractor <br /> from a state that provides a percentage bidding preference and does not have an <br /> office located in Washington, then a comparable percentage disadvantage will be <br /> applied to the Bid of that nonresident contractor. <br /> 1-03.2 Award of Contract <br /> Revise 1-03.2 to read as follows: <br /> Within 45 days after the opening of Bids, the City will act either to accept the Bid from <br /> the lowest responsive, responsible Bidder, or to reject all Bids. The City reserves the <br /> right to request extensions of such Bid acceptance period. If the lowest responsible <br /> Bidder and the City cannot agree on an extension by the 45 day deadline, the City <br /> Water Main Replacement"S" Division 1 —GENERAL REQUIREMENTS January 29, 2018 ' <br /> WO No—UP3664 SP—48 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.