My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reece Construction Company Inc 4/24/2018
>
Contracts
>
Capital Contract
>
Reece Construction Company Inc 4/24/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2019 10:44:28 AM
Creation date
4/26/2018 10:20:12 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reece Construction Company Inc
Approval Date
4/24/2018
Council Approval Date
3/28/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Improvement S
Public Works WO Number
UP3664
Tracking Number
0001163
Total Compensation
$1,866,805.49
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Reece Construction Co 9/12/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Reece Construction Company 8/29/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> Representative the description upon which the Contractor relied in preparing <br /> ' its Bid or laying out the Work. <br /> 1-04.1(3)D Utilities <br /> 1-04.1(3)D(1) General <br /> The City has endeavored to determine the existence of public and private <br /> utilities at the site of the Work from the records of the owners of known <br /> utilities in the vicinity of the Work. The positions of these utilities as derived <br /> ' from such records are shown on the Plans. Unless otherwise noted, no <br /> excavations were made to verify the locations shown for underground utilities. <br /> The service connections to the gas, electric, cable TV and communication <br /> utilities are not shown on the Plans. Refer to 1-07.17 UTILITIES AND <br /> SIMILAR FACILITIES regarding Contractor's responsibility for locating and <br /> verifying underground public and private utilities. <br /> 1-04.1(3)D(2) Unknown/Incorrectly Marked Utilities <br /> When a utility interferes with the Work and is either (1) not identified on the <br /> Plans or (2) located in a position significantly different from that specified on <br /> ' the Plans or in accordance with a particular utility's standard depth and <br /> location, Contractor shall follow the procedures of 1-04.7 DIFFERING SITE <br /> CONDITIONS (CHANGED CONDITIONS). Interference with the Work is <br /> defined as a utility that crosses or projects into the plane of the Work at an <br /> elevation between the top and bottom of the Work. <br /> 1-04.2 Coordination of Contract Documents, Plans, Special Provisions <br /> Specifications, and Addenda <br /> Revise the second paragraph of 1-04.2 to read as follows: <br /> Any inconsistency in the parts of the Contract shall be resolved by following this order <br /> of precedence: <br /> 1. Change Orders, <br /> 2. Addenda, <br /> ' 3. Contract, <br /> 4. Proposal Form, <br /> 5. Special Provisions, <br /> 6. Contract Plans, <br /> 7. City's Standard Drawings (if any) <br /> 8. WSDOT/APWA Standard Specifications for Road, Bridge, and Municipal <br /> Construction, <br /> 9. Amendments to WSDOT Standard Specifications for Road, Bridge, and <br /> Municipal Construction, and <br /> 10.WSDOT/APWA Standard Plans for Road, Bridge and Municipal Construction. <br /> In case of any ambiguity or dispute over interpreting the Contract, the Engineer's <br /> decision will be final as provided in 1-05.1 AUTHORITY OF THE ENGINEER. <br /> 1-04.3 Reference Information <br /> Revise 1-04.3 to read as follows: <br /> Reference Information provided to the Contractor is not part of the Contract. The City <br /> of Everett does not guarantee the accuracy of the Reference Information and is not <br /> responsible for the content of the Reference Information in any manner. Any use of <br /> Reference Information by the Contractor is done solely at the Contractor's risk. <br /> Water Main Replacement"S" Division 1 —GENERAL REQUIREMENTS January 29, 2018 <br /> WO No—UP3664 SP—51 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.