Laserfiche WebLink
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> 1-06.2(2)D Quality Level Analysis <br /> Delete 1-06.2(2)D. ' <br /> 1-06.3 Manufacturer's Certificate of Compliance <br /> Supplement 1-06.3 by adding the following: <br /> When authorized by the Standard Specifications or these Special Provisions and prior <br /> to use, the Engineer may accept certain Equipment on the basis of a Manufacturer's <br /> Certificate of Compliance as an alternate to Equipment inspection and testing. <br /> A Manufacturer's Certificate of Compliance shall be reserved for cases where111 <br /> compliance to Contract requirements is not readily determinable through inspection <br /> and testing of materials or Equipment. The Contractor shall provide properly <br /> authenticated documents to the City's Representative that the materials and <br /> Equipment comply with the Contract requirements. <br /> The Contractor shall pay all associated costs of providing each Manufacturer's <br /> Certificate of Compliance submitted for City acceptance. I <br /> The City reserves the right to refuse to accept Equipment on the basis of a <br /> Manufacturer's Certificate of Compliance. <br /> 1-06.3(1) Inspection at Point of Manufacturing I <br /> (******) <br /> The Contractor shall be responsible to reimburse the City for the costs of inspections <br /> at the point of manufacturing for inspections occurring outside of Whatcom, Skagit, I <br /> Island, Snohomish, King, Pierce and Thurston counties. Costs to be paid or <br /> reimbursed by the Contractor include, but are not limited to, travel, subsistence, labor <br /> and lodging expenses of the City Inspector. <br /> Point of manufacturing inspection will be required if: <br /> Inspection and testing of materials or Equipment in the vicinity of the Work by the <br /> City is not practicable, <br /> The Contractor requests the City to inspect and test material or Equipment at the <br /> point of manufacture, or <br /> The Standard Specifications or these Special Provisions require that inspection, <br /> testing or witnessing of tests take place at the point of manufacture. <br /> 1-06.4 Handling and Storing Materials <br /> Supplement 1-06.4 by adding the following: I <br /> Contractor shall store materials and Equipment so as to insure the preservation of their <br /> quality and fitness for the Work. Store Equipment and materials at location that <br /> facilitates inspection. The Contractor shall be responsible for damages, loss or <br /> casualty occurring to materials and Equipment until Final Acceptance. <br /> 1-07 LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC <br /> 1-07.1 Laws to be Observed <br /> Revise 1-07.1 by replacing "WSDOT" with "City" in the next to the last sentence of <br /> paragraph three. <br /> Supplement 1-07.1 by adding the following: <br /> The Contractor shall be in compliance with all applicable standards, orders, or <br /> requirements issued under Section 306 of the Clean Air Act [42 U.S.C. 1857(h)], <br /> Section 508 of the Clean Water Act (33 U.S.C. 1368), Executive Order 11738, and <br /> Environmental Protection Agency Regulations (40 CFR Part 15). (Contracts, <br /> subcontracts, and subgrants of amounts in excess of$100,000). <br /> Water Main Replacement"S" Division 1 —GENERAL REQUIREMENTS January 29, 2018 <br /> WO No—UP3664 SP-72 <br /> 1 <br />