My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reece Construction Company Inc 4/24/2018
>
Contracts
>
Capital Contract
>
Reece Construction Company Inc 4/24/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/12/2019 10:44:28 AM
Creation date
4/26/2018 10:20:12 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Reece Construction Company Inc
Approval Date
4/24/2018
Council Approval Date
3/28/2018
Department
Public Works
Department Project Manager
Richard Hefti
Subject / Project Title
Water Main Improvement S
Public Works WO Number
UP3664
Tracking Number
0001163
Total Compensation
$1,866,805.49
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Reece Construction Co 9/12/2018 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
Reece Construction Company 8/29/2019 Change Order 2
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> CITY OF EVERETT SPECIAL PROVISIONS <br /> by the State of Washington; water mains and their appurtenances; sanitary sewers and <br /> sewage disposal systems unless such sewers and disposal systems are within, and a <br /> part of, a street or road drainage system; telephone, telegraph, electrical power <br /> distribution lines, or other conduits or lines in or above streets or roads, unless such <br /> power lines become a part of a street or road lighting system; and installing or <br /> attaching of any article of tangible personal property in or to real property, whether or <br /> not such personal property becomes a part of the realty by virtue of installation. <br /> 1 For Work performed in such cases, the Contractor shall collect from the City, retail <br /> sales tax on the full Contract price. The City will automatically add this sales tax to <br /> each payment to the Contractor. For this reason, the Contractor shall not include the <br /> retail sales tax in the unit bid item prices, or in any other Contract amount subject to <br /> Rule 170, with the following exception. <br /> Exception: The City will not add in sales tax for a payment the Contractor or a <br /> Subcontractor makes on the purchase or rental of tools, machinery, equipment, or <br /> consumable supplies not integrated into the project. Such sales taxes shall be <br /> included in the unit bid item prices or in any other Contract amount. <br /> 1-07.2(4) Services <br /> The Contractor shall not collect retail sales tax from the City on any contract wholly for <br /> professional or other services (as defined in Washington State Department of Revenue <br /> Rules 138 and 244). <br /> 1 1-07.5 Environmental Regulations <br /> 1-07.5(4) Air Quality <br /> Delete all of 1-07.5(4) and substitute the following: <br /> The Contractor shall comply with all rules of the Puget Sound Clean Air Agency <br /> (PSCAA) (800-552-3565). These rules include PSCAA Regulation I. Excerpts of <br /> Regulation I are included in the Appendix D as it relates to fugitive dust control. <br /> The Contractor shall submit a dust control plan including dust control measures <br /> for its activities related to this Contract that may cause dust. This plan shall be <br /> submitted to the Engineer prior to commencing activity at the job site. <br /> 1-07.6 Permits and Licenses <br /> Supplement 1-07.6 by adding the following: <br /> A City of Everett business license is required for the Contractor and the <br /> Contractor's Subcontractors prior to commencing construction on this Contract. <br /> Contractor shall obtain all necessary permits required by law and the City of <br /> Everett. All general building, electrical, plumbing permits will be issued at no cost <br /> to the Contractor. In addition, obtain all required permits for waste disposal sites. <br /> Waste disposal sites shall be in the United States, unless otherwise expressly <br /> stated in the Contract Documents or the City gives prior written approval. <br /> This Project contains less than one acre of total disturbed area within the project <br /> limits and does not require Contractor to apply for Ecology's Construction <br /> Stormwater General Permit. <br /> 1-07.9 Wages <br /> 1-07.9(1) General <br /> Delete the first paragraph of 1-07.9(1) and substitute the following: <br /> This Contract is subject to the minimum wage requirements of RCW 39.12 and to <br /> RCW 48.28, as amended or supplemented. Workers shall receive no less than <br /> the prevailing rate of wage. Bidder shall use the Washington State Prevailing <br /> Water Main Replacement"S" Division 1 -GENERAL REQUIREMENTS January 29, 2018 <br /> WO No-UP3664 SP-75 <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.