Laserfiche WebLink
INSPECTION REPORT <br /> Date '�/zl1 j� Permit:16I_jQ l^6Z <br /> Contractor: `( <br /> Owner: Q <br /> o <br /> Site Address:_?)003 <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑LIFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> F-1Footingdrains ilio-g d ❑Refrigeration ❑Rough in <br /> ❑Roof drainsCBuilding Final /� / G/as Pipe Final ❑HWT Final <br /> OTHER OR C TATION: Y1_Vll.. j Z5 Z,- 7-19 - (A,z <br /> PROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> Arc <br /> IOG�' <br /> NQ re-Ag <br /> Mlk)c l-Jho-O <br /> b r. <br /> Inspector: <br /> EIR(10/06) DATABAR,INC. <br />