Laserfiche WebLink
CITY OF EVERETT <br /> PERMIT <br /> CONSTRUCTION MANAGER/PA: Maggie Inahara/Kerby Porter <br /> PROJECT NAME: 40-S3 Relocate AOG to 40-OS <br /> WORKORDER#: W4909319 <br /> PROJECT ARCHITECTURAL COSTS: $7500. (Racks are existing being moved) <br /> CONTRACTOR NAME: General Construction Company <br /> CONTRACT STATE LISC#: GENERCC9830Z <br /> CONTRACTOR CITY OF EVERETT LISC#: <br /> BRIEF OVERVIEW OF PROJECT SCOPE: Install pallet racks as part of AOG relocation to the 40-05. <br /> (Do not include electrical and mechanical Note: Overhead fire suppression is being installed as part of this <br /> costs. Contractors will secure these project. No requirement for in-pallet sprinkler system. <br /> permits) <br /> IN ADDITION TO PROVIDING THE ABOVE INFORMATION, PLEASE INCLUDE THE FOLLOWING <br /> DOCUMENTATION AS REQUIRED: <br /> For building permits, include (2) full size drawing sets, (3) site plans, (1) set of structural calcs, and any <br /> applicable energy code forms <br /> For pallet rack installations, include (2) copies of Existing/Proposed layouts and (2) sets of structural <br /> calculations. <br /> For Public Work permits, include (4) full size drawing sets and (2) sets of drainage calcs. <br /> For questions, please contact Dave Tyler at 425-239-7983 or email me at david.d.tyler@boeing.com <br />