Laserfiche WebLink
; <br /> e <br /> Boeing Factory Transformation Project <br /> LRIP 777X Wings <br /> Disposal Details <br /> Soil Haul & Disposal <br /> 1. Location — 40-23 Building, Everett, WA <br /> 2. Estimated Quantity — 9,450 CY or 430 Truck Loads <br /> 3. Disposal Sites — Cemex, 6300 Glenwood Ave., Everett, WA <br /> 4. Truck/Haul Route — See attached map A <br /> Concrete Haul & Disposal <br /> 1. Location — 40-23 Building, Everett, WA <br /> 2. Estimated Quantity — 4,450 Tons or 180 Truck Loads <br /> 3. Disposal Sites — North Hill Resources — 609 North Hill Blvd., <br /> Burlington, WA <br /> 4. Truck/Haul Route — See attached map B ��'j �� <br /> JAN 14 20t6 <br /> CITY OF E�ERETT <br /> Per►riit Services <br /> APPR4VED <br /> PUBLI ORKS DEPAR �d� <br /> BY <br /> DATE ����� 2C�I6 <br /> CITY OF EVERETT REV{EWED FOR PERMIT <br /> APPROUED <br /> PLANNlNG & COMMUNITY <br /> DEVEL NT�PT. <br /> � B <br /> DATE� � �.L�` <br /> r�---�_. <br /> �'\-_`_ � C� <br /> � <br />