Laserfiche WebLink
2. Devefiopments with hazardous materials on-site, including fuel tanks, must comply with ail <br /> applicable local, state and federal requirements. All devefopments using toxic or hazardous � <br /> materials must incarporate facilities and procedures for�he safe handling anc( effective monitoring <br /> of toxic ar hazardous materials, which include spill entrapment, training, and special handling, thus . <br /> reducing the potential far release of hazardous or toxic materials to the groun�water system. �5ee j <br /> Secti�n 3.F of the Ef5} {SEPA Water, Plant and Animal, and Land and Shoreline Use Policies) I <br /> ' <br /> 3. Staging areas €or vehicle maintenance activities during construction must be specified. These , <br /> areas must be we{I away from all drainage courses. (SEPA Water, Plant and Animal and Land and <br /> Shorefine Use Policies} <br /> 4. All storm drains must be stenciled with fang�age similar to the following: "Dump Na Waste, <br /> Drains ta (Stream/Wetland/Groundwater)." This reminder is typically spray-painted on to the <br /> ground adjacent to the catch basin with the use of a stencil. The treatment needs to be repeated, <br /> approximately annual}y, when fihe paint wears off. The developer/owner may either perform the <br /> stenciling, or give permission for voiunteer groups to enter onto the property and perform the <br /> stenciling. {S�PA Water, Plant and Animal, and Land anc! Shareline Use P�licies) <br /> 5. During construction activities, all spills must be cc�ntained and removed in such manner as to <br /> prevent their entering the waters and soils of the state. Cleanup of spills shall take precedence over <br /> ather work on-site. (SEPA Water, Plant and Animal, and l.and and Shoreline LJse Policies) <br /> 6. Construction equipment and �ehicles must be rnaintained so they do not leak fuefs or lubricants. <br /> puring canstruction, a staging area must be specified for all vehicle maintenance activities. The <br /> staging area must be located well away from ali drainage courses. Where possible, all stormwater <br /> from related maintenance areas must be directed to the sanitary sewer, rather than the stormwater <br /> system. (SEPA Earth,Water and Environmental Heaith Policies} <br /> 7. During constructian activities, al( spills of fuel and hazardous materia�s must be contained and <br /> removed in such a manner as to prevent their entering the waters and soils of the State. Cleanup of <br /> spills must take precedence over other wark on site. (SEPA Earth, Water and Environmental Nealth <br /> � Policies) <br /> 8. During construction, all petroleum products, chemicals, and building materials that could <br /> contaminate runoff must be stored in a lined covered area. An impervious berm must be <br /> constructed arour�d the perirneter of the storage area. The storage area must be located away from <br /> environmentally sensitive areas. (SEPA �arth,Water and Environmental Health Poiicies) <br /> 9. On sites containing hazardous materials, pracedures tr� use 'sn case flf spills must be posted. <br /> � 4SEPA Earth, Water and Environmental Health Policies) <br /> �-' ,,.., <br /> r p�� <br /> ;? 3 r ...*'� <br /> _, <br /> � <br /> ��h.,,,>,ae� <br />