Laserfiche WebLink
INSPECTION REPORT '11 <br /> ���� )'LiiiS .esO2 - - <br /> Dater Permit: <br /> Contractor: $'U Can* <br /> I1\ r <br /> Owner: a. <br /> Site vick <br /> d e S: 36-oS u6 ecks V l(J *40,210 <br /> TYPE OF INSPECTION REQUESTED 6& j c_ <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> Li Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Servic- ❑Framing ❑Rooftop Units ❑Water Service <br /> ■ = ounding Li Insulation ❑Mechanical Final ❑Medical Gas <br /> P eding Gn. Li Drywall Nailing ❑Plumbing Final <br /> i. -ectrical inal ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ■Foo'.• • s ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HINT Final <br /> OTHER OR CONSULTATION: <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS P R <br /> ❑ OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. Li VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR "REINSPECTION-24 hour notice required <br /> 2 <br /> Inspector: ....7f J i Date: <br /> EIR(4/09) YO/l-/44.4.727, FORMS ROMOTIONS•425/488-8900 <br />