Laserfiche WebLink
INSPECTION REPORT <br /> Date � Permit: � l��' ��2. <br /> Contractor: C���� ����`Ci�__. <br /> Owner: � � <br /> SiteAddress ��J �__�Q.�i�{� �'� �-�',b —?�� <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ' ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In ' <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structurai Siab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> p Ceiling Grid ❑Drywall Nailing ❑Plumbing Finai <br /> •�'Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION:��__�.__ � <br /> PROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PER <br /> OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION–24 hour notice required <br /> _ . _— <br /> o ���� <br /> Inspector: Date: <br /> EIR(10/06) DATABAR,INC. <br />