Laserfiche WebLink
- I NSPECTION REPORT � <br /> Date �1��//��Permit: _�I7D -04-3 <br /> Contractor: � _� _ _ <br /> Owner: �il�� <br /> Site Address: J�,�����_ <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑fiemp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structurai Siab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑ iling Grid ❑Drywall Nailing ❑Plumbing Final <br /> Electrical Final ❑Shear Nailing GAS PIPE <br /> E WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Buitding Final ❑Gas Pipe Final ❑HWT Final <br /> OT OR CONSULTATION:___ _,___.____.-_________.—__ <br /> ROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PER <br /> OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: __ _ _ ______ _ <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> °—�-. <br /> Inspector: Date:/ � � � <br /> EIR(10/06) DATABAR,INC. <br />