Laserfiche WebLink
INSPECTION REPORT <br /> Date (�/L�/�/ Permit: ����U— 1�T <br /> �:,. ���`� <br /> Contractor: <br /> Owner: __�I� -- — <br /> SiteAddress: �w.,J __��/� �Q� Z"v ' �J � <br /> TYPE OF WSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork 0 Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structurai Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑ eiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> Electrical Final ❑Shear Nailing GAS PIPE <br /> TE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Buitding Final ❑Gas Pipe Final ❑HWT Final <br /> HER OR CONSULTATION: <br /> PROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS E IT <br /> OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> OK FOR C.O. ❑ VIOLATION <br /> UNABLE TO PERFORM INSPECTION: ________ __ <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> � <br /> � -� <br /> Inspector: Date: �` <br /> EIR(10/06) DA ABAR,INC. <br />