Laserfiche WebLink
INSPECTION REPORT <br /> Date �__ �j�_ Permit: _����_�z-/ <br /> _�,--" <br /> Contractor: <br /> Owner: � <br /> -- -- �--=��� <br /> Site Address: ��� _� �__I�GV 7(/ " J�, � <br /> TYPE OF INSPECTION REQUESTED <br /> ECTRICAL BUILDING MECHANICAL PLUMBING <br /> ervice ❑UFER ground ❑Groundwork/Siab ❑Groundwork/Slab <br /> Groundwork ❑Footing ❑Rough In ❑Rough in <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywail Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OT R OR CONSULTATION:___`T_��'[Y_��_�D�`'' `� <br /> OVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: _____ <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> Inspector: Date: �� /� <br /> EIR(10/06) • DATABAR,WC. <br />