Laserfiche WebLink
� <br /> Project 40-33 Replacing compressorproject Phase 2 <br /> Subject Structural calculation <br /> Project description: <br /> Support mechanical and electrical deciplines for putting new compressors on the ground floor <br /> of 40-33 building ( gridline# 12.5 to 13/H to I) , a substation on the mezzanine IeveL <br /> Scope: <br /> 1. Provide one underground utilities trenches for mechanical and electrical. <br /> 2. Check and validate the mezzanine floor can take the new over-head crane loads. Provide <br /> reinforcement as required. <br /> 3. Provide pipe support for mech. elec. OK by inspections <br /> 4. Interior partition structural support are OK by inspections. <br /> Structural calculation index: <br /> A. Check existing W27x84 composite beam for new crane loads. <br /> B. Design 1 st floor concrete floor concrete beam to support grating for forklift traffic. <br /> C. Design the utilities trench concrete wall &footing <br /> : � <br /> l� <br /> ,4 <br /> ��° �� <br /> � � <br /> � <br /> �� �`�� w� <br /> p �, 41256 ��p � <br /> � �Grs�4 G <br /> SSI�NAL�� <br /> D�PIRES 1 <br /> Prepared by: Ted Date Checked by: Date <br />