Laserfiche WebLink
4.f& �. <br /> . €3a�� <br /> sJ�f4�t�'T,�� ��"�iE� <br /> Jt3B �AIl�E <br /> Ciien�6�rc���c� �a., i�ap�ii�able <br /> �azan P�csj�����.�x-xxx� <br /> Copies returned with review: [4}products book+ [0] drawings - <br /> NOTES: <br /> 1. All submittal review action, by the reviewer, is included on this"Submittal Review" <br /> Document.. Marks on the reviewed material shall not be considered a.part of the <br /> review unless specifically r.eferenced here. Contractdr shall attach a copy of the <br /> review to alf portions.extracted from the submittal. <br /> 2. This purpose of this review is to assure general conformance with the design <br /> concept and contract documents. Review comments shall not be construed to be <br /> directives to change the contract requirements and Contractor shal� contact <br /> reviewer or offer a Change Proposal if it is perceived that the review conflicts with <br /> contract requirements. Contractor is responsible to verify suitability of information <br /> " that pertains to manufacturing processes, interface with job site conditions, means <br /> of construction and methods of construction. <br /> 3. Definitions: <br /> • No Exceptions: Subject to the qualifications and remarks (if any) in the <br /> "Comments" column, the item is considered to be satisfactoryfor incorporation <br /> into the project. <br /> • Correct: Make changes noted in the"Comments" column; re-submittal not <br /> required. <br /> • Rejected: Reviewer has reviewed the item and the item is determined to be <br /> unsatisfactory for the reason(s) listed in"Comments." Correct& Resubmit <br /> item. <br /> • Architect: Item is knawn to require selection of finish (configuration, color, <br /> texture, etc.) by Architect and review shall no�be complete until this is done. <br /> 4. Voltage and Phase: Submitter shall verify voltage and phase to be suitable for the <br /> project <br /> END OF REVIEW <br /> ���� ` ��� <br />