Laserfiche WebLink
INSPECTION REPORT <br /> 2 <br /> a <br /> Date: / 44 Permit: 'V\ ) 1 -- 1 S44 <br /> Contractor: frA. Q <br /> iNt- " tU - 0 l0 <br /> 0toriL <br /> Owner: L <br /> Site Address: 3 V" L6 l V b • 41-1 0-4 I <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑ Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑ Mechanical Final ❑Medical Gas <br /> Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑ Rough In <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> PROVAL ❑ PARTIAL APPROVAL FINALAPPROVALT PE'�T <br /> ❑ OK FOR T.C.O. <br /> ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION '1 <br /> I=1 UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION-24 hour notice required <br /> Inspector: � Date: 7 <br /> EIR(4/09) /-•&o.. _RE F MS&PR OTIONS•425/488-8900 <br />