Laserfiche WebLink
� Page 1 of 51 08/24/2012 <br /> � � <br /> /�� / <br /> i "' —1 �`T�S <br /> Cus2om Air Handters . ^ � <br /> . - . ��� . O� � <br /> CUSTOM AIR HANDLING UNIT SUBMITTAL <br /> Date of Original Submittal: <br /> Project• Boeing 40-30/53 Upper Deck AHU Date of Current Version: Aug 24, 2012 <br /> Location• Everett, Washington Prepared By: Darren Wilde <br /> Consultant• DLR Group Revision: <br /> Trane Sales Engineer: Eric Holmquist Trane Sales Engineer: Eric Holmquist <br /> Internal Review By• Date of Review: <br /> Tagging: AC-1,2,3,4 � <br /> Approval Stamps: <br /> If above space is filled, please stamp on reverse side. <br /> Submittal approval dates are the basis for determining manufacturing lead times. Manufacturing will not begin and <br /> shipping dates will not be issued, until we receive approved, stamped submittal drawings. Performance, openings and <br /> dimensions ma var from contract documents. Return of a roved drawin s constitutes acce tance of these variances. <br /> Tt'vne 9900 Aire Circle,Fort Smith,AR 72916 Phone:(479)648-7402 Fax:(479)648-7499 <br />